Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION452820HERGENREDER
22N2-4HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
AC
6/1/2023
WATTENBERG
90750
WELD  123
NWNW 33 3N68W 6
452820View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A )
401344063
10/25/2017
The Approved Form 2A permit will be posted at the location during construction, drilling, and completions operations.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
401344063
10/31/2017
604c.(2).E. Multi-Well Pads: In order to reduce surface impact, this application is for a seven (7) well pad.
PlanningForm: (02A )
401344063
10/31/2017
604c.(2).Q. Guy Line Anchors: Guy line anchors will not be used. Base Beams will be used to stabilize the rig and removed after drilling.
PlanningForm: (02A )
401344063
10/31/2017
604c.(2).R. Tank Specifications: Two 500 barrel skid-mounted frac tanks will be temporarily placed on-site for use of the pre-spud rig only. One tank will store water and the other will store water based mud.
PlanningForm: (02A )
401344063
10/31/2017
604c.(2).S. Access Roads: KMG will utilize a very short access from County Road 28 for drilling, completions, and production operations, including maintenance equipment. Any necessary right-of-way or agreement will be obtained from the appropriate jurisdiction. The road will be properly maintained to accommodate for local emergency vehicle access.
Community Outreach and NotificationForm: (02A )
401344063
10/31/2017
305.a.(2) A Notice of Intent to Conduct Operations was sent to each building unit owner within the Buffer Zone Setback. Recipients did not contact KMG. As a part of planning this proposed location, KMG held multi-disciplinary Surface Impact Planning Meetings regarding the impacts and mitigations associated with this proposed location. The toll-free hotline number and email for the Anadarko Colorado Response Line will be posted at the entrance to the lease access road for stakeholders during drilling and completion operations at this proposed location. Courtesy Notifications will be sent to impacted stakeholders prior to drilling operations and again prior to completions operations, providing contact information for the Anadarko Colorado Response Line and online resources.
Traffic controlForm: (02A )
401344063
10/31/2017
604c.(2).D. Traffic Plan: Prior to the commencement of operations, the operator will obtain the necessary access and/or ROW permits from Weld County and implement COAs or traffic control plans as required.
General HousekeepingForm: (02A )
401344063
10/31/2017
604c.(2).O. Loadlines: All loadlines shall be bull-plugged or capped.
General HousekeepingForm: (02A )
401344063
10/31/2017
604c.(2).P. Removal of Surface Trash: A commercial size trash bin for removing debris will be located on site. This bin will be for use by all parties affiliated with the operation. Upon completion of operations, the commercial trash bin will be removed from the location and disposed of in an appropriate manner.
General HousekeepingForm: (02A )
401344063
10/31/2017
604c.(2).W. Site-Specific Measures: KMG maintains a Storm Water Management Plan that assesses erosion control for every KMG operated location. This location will be added to this plan once construction begins. This site will be inspected every fourteen (14) days during construction activities, every twenty-eight (28) days after construction is completed, and after any major weather event
Material Handling and Spill PreventionForm: (02A )
401344063
10/31/2017
604c.(2).F. Leak Detection Plan: Automation technology will be utilized at this facility. This technology includes the use of fluid level monitoring for the tanks and produced water sumps, high-level shut offs, and electronic sensors to monitor the interstitial space of double-walled produced water sumps. All automation is monitored by Kerr-McGee’s Integrated Operations Center (IOC), which is manned 24 hours per day, 7 days per week.
Material Handling and Spill PreventionForm: (02A )
401344063
10/31/2017
604c.(2).N. Control of Fire Hazards: KMG and its contractors will employ best management practices during the drilling and production of its wells and facilities and will comply with appropriate COGCC rules concerning safety and fire. KMG will ensure that any material that might be deemed a fire hazard will remain no less than twenty-five (25) feet from the wellhead(s), tanks and separator(s).
Material Handling and Spill PreventionForm: (02A )
401344063
10/31/2017
606.A.d. Control of Flammable Liquids - Flammable liquids will not be stored within 50’ of the proposed wellheads. If storage of flammable liquid is to be conducted within 50’ of the wellhead, sufficient safety measures will be implemented.
Dust controlForm: (02A )
401344063
10/31/2017
805.c. Dust: Water will be placed on dirt access roads to mitigate dust as needed. If feasible, magnesium chloride will also be used as needed on access roads to further abate dust.
ConstructionForm: (02A )
401344063
10/31/2017
604c.(2).G. Berm Construction: KMG will construct a berm or diversion dike, site grading, or other comparable measures sufficient to further protect the ditch located 0' North of this proposed oil and gas location.
ConstructionForm: (02A )
401344063
10/31/2017
604c.(2).M. Fencing Requirements: The completed wellsites will be surrounded with a fence and gate with adequate lock to restrict access to authorized personnel only. KMG personnel will monitor the wellsites regularly upon completion of the wells. Authorized representatives and/or KMG personnel shall be on-site during drilling and completion operations.
Noise mitigationForm: (02A )
401344063
10/31/2017
604c.(2).A. Noise: DRILLING: Sound surveys have been conducted on each rig type and are utilized to anticipate any additional effective noise mitigation once a drilling rig is determined. During drilling operations, at a minimum and pending a safety review after construction of the location, sound mitigation barriers will be placed as follows: Sound wall: +/- 680' across 50% of the northern location edge (beginning at the eastern edge of the NW access entrance running east), 50% of the western location edge (beginning at the NW corner running south), and 50% of the southern location edge (beginning at the SW corner running east). Straw Bales: +/- 1116' across 50% of the northern location edge (beginning at the NE corner running west), 100% of the eastern location edge, 50% of the southern location edge (beginning at the SE corner running west), and 50% of the western location edge (beginning at the SW corner running north). COMPLETIONS: During completion operations, a similar combination of mitigations barriers and best-available technologies will be reviewed and deployed as appropriate. Should technical advancements allow for better noise mitigation at the time of drilling and completion operations on this location, KMG wiil re-evaluate the most effective method(s) at that time.
Emissions mitigationForm: (02A )
401344063
10/31/2017
604c.(2).B. Closed Loop Drilling System: KMG will use a closed loop or “pitless” system for drilling and fluid management and will not construct a reserve pit.
Emissions mitigationForm: (02A )
401344063
10/31/2017
604c.(2).C. Green Completions: Temporary above ground polyethylene water pipelines will deliver water to location operations from larger trunk lines to reduce truck traffic and minimize air pollution. Pipeline infrastructure is in place prior to completions operations to ensure saleable gas, once hydrocarbons are cut, is sent directly to sales without flaring during flowback.
Odor mitigationForm: (02A )
401344063
10/31/2017
805b. Odors: KMG will comply with the provisions of Rule 805b as deemed applicable.
Odor mitigationForm: (02A )
401344063
10/31/2017
Additional BMPs for the Hergenreder location are: 1) the storage of excess drilling fluid (e.g., fluid not being used in the active mud system) in closed, upright tanks; and 2) the use of an odor neutralizer in the active mud system.
Final ReclamationForm: (02A )
401344063
10/31/2017
604c.(2).T. Well Site Cleared: The wellsite will be cleared of all non-essential equipment within ninety (90) days after all wells associated with the pad have been plugged and abandoned.
Final ReclamationForm: (02A )
401344063
10/31/2017
604c.(2).U. Identification of Plugged and Abandoned Wells: Pursuant to rule 319.a.(5)., once the well has been plugged and abandoned, KMG will identify the location of the wellbore with a permanent monument that will detail the well name and date of plugging.