Construction | Form: (02A ) 401169408 8/31/2017 | Operator will provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42. |
Drilling/Completion Operations | Form: (02A ) 401169408 8/31/2017 | Green Completions - Emission Control System: Test separators and associated flow lines and sand traps shall be installed on-site to accommodate green completions. techniques pursuant to COGCC Rules. Operator will have a permanent gas sales line in place prior to starting flowback to handle saleable quantities of gas. Any non-saleable quantities of gas will be thermally oxidized in an emissions control device (ECD). This ECD shall have an adequate capacity for 1.5 times the largest flowback within a 10-mile radius, will be flanged to route gas to other or permanent oxidizing equipment, and shall be provided with the equipment need to maintain combustions where non-combustible gases are present. |
Planning | Form: (02A ) 401169408 8/31/2017 | Operator will re-evaluate the location of the DWR Water Well (Permit # 50380-MH) during clearing and grading of the location. |
Drilling/Completion Operations | Form: (04 ) 401767349 9/27/2018 | Operator Certifies that the MLVT will be designed and implemented according to the COGCC MLVT Policy dated June 13, 2014 and that there are no building units down gradient from the proposed MLVT. |