Planning | Form: (02A ) 401273477 8/9/2017 | In order to reduce surface impact, this application is for an 8 well pad. |
General Housekeeping | Form: (02A ) 401273477 8/9/2017 | Mud control: when conditions exist that roads are excessively muddy, additional fill material will be added in order to dehydrate the environment and reduce the amount of material that is transported from the wells roads and location to off-site areas. |
Storm Water/Erosion Control | Form: (02A ) 401273477 8/9/2017 | Stormwater management plans (SWMP) will be in place to address construction, drilling, and operations associated with CDPHE permits. BMPs for stormwater will be implemented around the perimeter of the pad prior to or during construction and will vary according to the location. These BMPs will remain in place and maintained throughout operations until final reclamation. |
Material Handling and Spill Prevention | Form: (02A ) 401273477 8/9/2017 | Drip pans will be used during fueling of equipment to contain spills and leaks. Visual inspections of pipe and connections will be performed frequently to detect leaks which will be immediately corrected, repaired and reported to COGCC as required. Spill prevention Control Countermeasure (SPCC) will be in place to address any possible spill associated with oil and gas operations. |
Material Handling and Spill Prevention | Form: (02A ) 401273477 8/9/2017 | During drilling operations, we anticipate 4-5 loads, @ 20 yards per load, of cuttings per day will be transported off-site to an approved disposal facility in accordance with Operator’s waste management plan. All loads leaving the location will have a manifest and will be documented. Water-based and Oil-based cuttings will be disposed of offsite and at a licensed, commercial disposal site. |
Dust control | Form: (02A ) 401273477 8/9/2017 | To prevent dust from becoming a nuisance to the public, water trucks will be utilized to spread water across any dust problem areas. |
Construction | Form: (02A ) 401273477 8/9/2017 | Location will be graded to divert surface runoff away from surface water features. Operator will create tertiary containment by construction of a berm, diversion ditch, sediment trap or comparable measures sufficient to direct stormwater away from the Denver Hudson Canal located ±473' W and two ditches located ±561' and ±564' SW of the location. |
Noise mitigation | Form: (02A ) 401273477 8/9/2017 | Operator will consult with owners of residents and occupied structures and other stakeholders to reduce impact of noise and light during drilling and completion operations. The direction of prevailing winds is considered when planning the location in order to mitigate odor and noise from being a nuisance to the surrounding residents and occupied structures. In order to minimize sound levels during drilling operations at nearby residences, rig generators will be located as far as possible from the residence by rig orientation. Rig lighting will also be directed away from residential units. |
Final Reclamation | Form: (02A ) 401273477 8/9/2017 | P&A’d wells will be identified and marked pursuant to 319.a.(5). Within 90-day subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site. |