Storm Water/Erosion Control | Form: (02A ) 401175200 4/4/2017 | 604c.(2).G. Berm Construction: Kerr-McGee will create tertiary containment by construction of a berm or diversion dike, site grading, or other comparable measures sufficient to further protect the ditch once relocated currently located 0' east of this proposed oil and gas location and the intermittent stream located 602' to the west. |