Planning | Form: (02A ) 401151995 2/6/2017 | The EWS 4 is a single well pad that will be linked to the EWS Facility #4 by a buried 4-
inch pipeline. |
Traffic control | Form: (02A ) 401151995 2/6/2017 | Access road. The access road will be constructed to accommodate local emergency
vehicles. This road will be maintained for access until drilling and completion
operations are complete. Emergency access will be at the EWS Facilty #4 once drilling
and completion operations are complete. |
General Housekeeping | Form: (02A ) 401151995 2/6/2017 | Fencing requirements. A permanent fencing plan will be created for the site by Expedition during
the final construction of the location. Expedition is under contract to purchase the property and will be the surface owner at the time of construction. |
General Housekeeping | Form: (02A ) 401151995 2/6/2017 | Removal of surface trash. All trash, debris and material not intrinsic to the operation of
the oil and gas facility shall be removed and legally disposed of as is applicable. |
Material Handling and Spill Prevention | Form: (02A ) 401151995 2/6/2017 | Leak Detection Plan. Staff will visit the location daily and visually inspect all fittings
for leaks. Additionally, monthly documented SPCCP inspections are conducted
pursuant to 40 CFR §112. There will be no produced water or hydrocarbon storage
tanks at this location. |
Material Handling and Spill Prevention | Form: (02A ) 401151995 2/6/2017 | Berm construction. No permanenet berms shall be constructed at this site. The drill pad will be bermed during drilling operations. |
Material Handling and Spill Prevention | Form: (02A ) 401151995 2/6/2017 | Load-lines. All load-lines shall be bull-plugged or capped. |
Material Handling and Spill Prevention | Form: (02A ) 401151995 2/6/2017 | Tank specifications
No tanks for produced water or hydrocarbons will be constructed on this site. |
Noise mitigation | Form: (02A ) 401151995 2/6/2017 | Lighting abatement measures shall be implemented, including the installation lighting
shield devices on all of the more conspicuous lights and low density sodium lighting
where practicable. Rig shrouding is not believed necessary as this is a remote area.
Permanent equipment on location shall be muffled to reduce noise, or shall be
appropriately buffered. |
Odor mitigation | Form: (02A ) 401151995 2/6/2017 | Oil & gas facilities and equipment shall be operated in such a manner that odors and
dust do not constitute a nuisance or hazard to public welfare. |
Drilling/Completion Operations | Form: (02A ) 401151995 2/6/2017 | Closed Loop Drilling Systems – Pit Restrictions. Not applicable; a closed-loop system
will be used for drilling. |
Drilling/Completion Operations | Form: (02A ) 401151995 2/6/2017 | Green Completions – No hydrocarbons are anticipated to be produced from this well.
Producing zones will be cased off and cemented. |
Drilling/Completion Operations | Form: (02A ) 401151995 2/6/2017 | Blowout preventer equipment (“BOPE”). A double ram and annular preventer will be
used during drilling. At least the drilling company shall have a valid well blowout
prevention certifications. |
Drilling/Completion Operations | Form: (02A ) 401151995 2/6/2017 | BOPE for well servicing operations. Adequate BOP equipment shall be used. Stabbing
valves shall be installed in the event of reverse circulation and shall be prior tested
with low and high pressure fluid. |
Drilling/Completion Operations | Form: (02A ) 401151995 2/6/2017 | Pit level indicators. Not applicable; a closed-loop system will be used and no pits shall
be dug. |
Drilling/Completion Operations | Form: (02A ) 401151995 2/6/2017 | Drill stem tests. Not applicable; no Drill Stem tests are planned. |
Drilling/Completion Operations | Form: (02A ) 401151995 2/6/2017 | Control of fire hazards. All materials which are considered fire hazards shall be a
minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall
comply with API RP 500 and will comply with the current national electrical code. An
emergency response plan shall be generated for this site. |
Drilling/Completion Operations | Form: (02A ) 401151995 2/6/2017 | Guy line anchors. All guy line anchors shall be brightly marked pursuant to Rule 604.c
(2)Q. |
Final Reclamation | Form: (02A ) 401151995 2/6/2017 | Within 90-day subsequent to the time of plugging and abandonment of the entire site,
superfluous debris and equipment shall be removed from the site. |
Final Reclamation | Form: (02A ) 401151995 2/6/2017 | P&A’d wells shall be identified pursuant to 319.a.(5). |
Traffic control | Form: (02A ) 401716056 11/23/2018 | Access road. The access road will be constructed to accommodate local emergency
vehicles. This road will be maintained for access until drilling and completion
operations are complete. Emergency access will be at the EWS Facilty #4 once drilling
and completion operations are complete. |
General Housekeeping | Form: (02A ) 401716056 11/23/2018 | Removal of surface trash. All trash, debris and material not intrinsic to the operation of
the oil and gas facility shall be removed and legally disposed of as applicable. |
Storm Water/Erosion Control | Form: (02A ) 401716056 11/23/2018 | During drilling operations, the location will have a berm or ditch installed along at least the southwest edge of the location, parallel to the nearest property line. |
Material Handling and Spill Prevention | Form: (02A ) 401716056 11/23/2018 | Leak Detection Plan. Staff will visit the location daily and visually inspect all fittings
for leaks. Additionally, monthly documented SPCCP inspections are conducted
pursuant to 40 CFR §112. There will be no produced water or hydrocarbon storage
tanks at this location.
|
Drilling/Completion Operations | Form: (02A ) 401716056 11/23/2018 | Blowout preventer equipment (“BOPE”). A double ram and annular preventer will be
used during drilling. At least the drilling company shall have a valid well blowout
prevention certifications. |