LOCATION443255Pathfinder C-18
2
AUSCO PETROLEUM INC
10412
AC
1/11/2021
WILDCAT
99999
FREMONT  043
NWNE 18 20S69W 6
443255View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400852031
07/09/2015
Per CPW Consultation, reclamation activities will be conducted in accordance with the stipulations provided by the Colorado Division of Parks and Wildlife. Per CPWs review and consultation, all surface disturbance activities including interim reclamation shall be conducted outside the period of December 1 to April 15 in order to protect sensitive elk winter concentration area.
OGLAForm: (02A)
400852031
07/09/2015
The moisture content of the drill cuttings managed onsite shall be kept as low as practicable to prevent accumulation of liquids greater than de minimis amounts. Mixing, management or stockpiling of cuttings prior to disposal in the drilling pit shall be conducted on an impermeable surface with perimeter berming. Drill cuttings disposed of onsite shall meet the applicable standards of Table 910-1. A minimum of 1 discrete soil sample shall be collected for every 100-cubic-yards of cuttings to disposed of within the drilling pit. Analytical results shall be submitted to the COGCC within 30 days. Operator shall submit the coordinates of the drilling pit (SE corner) within 30 days from closure. Cuttings that do not meet 910-1 standards within 45 days of drilling well to depth shall be disposed of at an offsite commercial facility.
OGLAForm: (02A)
400852031
07/15/2015
Operator shall provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42.
OGLAForm: (02A)
400852031
07/23/2015
Unnecessary or excessive flaring is prohibited. Operator shall direct all salable quantity gas to a sales line as soon as practicable or shut in and conserved.
OGLAForm: (02A)
400852031
07/23/2015
Operator shall line the cuttings trench with an impermeable liner. Upon verification that drilling waste meets Table 910-1 standards and prior to backfill and burial of the drilling waste, the liner shall be removed and disposed offsite.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
General HousekeepingForm: (02A )
400852031
9/18/2015
Materials and fluids will be stored neat and orderly. Wastes will be temporarily stored in sealed containers and regulary collected and disposed of at offsite, suitable facilities. Prompt cleanup of spills will be required to minimize any commingling of waste materials with stormwater runoff. Routine maintenance will be limited to fueling and lubrication of equipment. Drip pans will be used during routine fueling and maintenance to contain spills or leaks. Any waste product from maintenance will be containerized and transported offsite for disposal or recycling. There will be no major equipment overhauls conducted onsite. Cleanup will consist of patrolling the roadways, access areas, and other work areas to pick up trash, scrap debris, other discarded materials, and any contaminated soil. These materials will be disposed of properly.
Storm Water/Erosion ControlForm: (02A )
400852031
9/18/2015
A berm and containment plan and site will be ready to make sure the closest water stream 440' away is not reached. This plan will include, using steel ring berms keyed into a synthetic liner around production facilities and additional BMP's will include tertiary containment along the cross and down gradient parameters of the location
Dust controlForm: (02A )
400852031
9/18/2015
Aus-Tex will apply appropriate measures to ensure dust control and mitigate potential impacts resulting from dust emissions.