LOCATION441408Townsend Battery
5H-P267
CRESTONE PEAK RESOURCES OPERATING LLC
10633
AC
5/9/2017
SPINDLE
77900
WELD  123
SESE 5 2n67w 6
441408View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400802236
04/28/2015
Operator shall provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42 per Rule 316C.c.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
General HousekeepingForm: (02A )
400802236
8/5/2015
Per Rule 604c(2)N Any material not in use that might constitute a fire hazard will be removed a minimum of twenty-five (25) feet from the wellhead, tanks and separator. Any electrical equipment installations inside the bermed area will comply with API RP 500 classifications and comply with the current national electrical code as adopted by the State of Colorado.
General HousekeepingForm: (02A )
400802236
8/5/2015
Per Rule 803, to the extent practicable, Encana shall direct site lighting downward and inward, and lighting shall be shielded so as to avoid glare on public roads and Building Units within one thousand (1000) feet.
General HousekeepingForm: (02A )
400802236
8/5/2015
Per Rule 805.c. Encana shall employ practices for control of fugitive dust caused by their operations. Such practices shall include but are not limited to the use of speed restrictions, regular road maintenance, restriction of construction activity during high- wind days, and silica dust controls when handling sand used in hydraulic fracturing operations. Additional management practices such as road surfacing, wind breaks and barriers, or automation of wells to reduce truck traffic may also be required if technologically feasible and economically reasonable to minimize fugitive dust emissions
General HousekeepingForm: (02A )
400802236
8/5/2015
Per Rule 804. Production facilities, observable from any public highway shall be painted with uniform, non-contrasting, non-reflective color tones and with colors matched to but slightly darker than the surrounding landscape.
Material Handling and Spill PreventionForm: (02A )
400802236
8/5/2015
"• Annual hydrostatic test on the oil dump line from the separator to the tank battery. • Annual hydrostatic “static” tests on our oil tanks. • Annual hydrostatic “static” tests on our produced water tank and water dump line from the separator to the produced water tank. • Lease Operator inspections of all equipment not to exceed 48 hours. • Monthly documented inspections (EU). • Annual environmental inspections of all battery and well equipment and pads. • Annual UT inspections of the pressure vessels and input into Encana’s RIPL Predictive Integrity Maintenance Program. (HLP separators and fuel gas separators)"
Material Handling and Spill PreventionForm: (02A )
400802236
8/5/2015
Per Rule 805.b.(3)B.iii. Well effluent containing more than ten (10) barrels per day of condensate or within two (2) hours after first encountering hydrocarbon gas of salable quality will be directed to a combination of sand traps, separators, surge vessels, and tanks as needed to ensure safe separation of sand, hydrocarbon liquids, water, and gas and to ensure salable products are efficiently recovered for sale or conserved and that non-salable products are disposed of in a safe and environmentally responsible manner.
ConstructionForm: (02A )
400802236
8/5/2015
Per Rule 604.c.(2)A.. The pad will be constructed in such a manner that noise mitigation may be installed and removed without disturbing the site or landscaping.
ConstructionForm: (02A )
400802236
8/5/2015
Encana utilizes 24” tall corrugated galvanized metal berm walls with a capacity in excess of 150% of the largest tank contained within the wall. In addition, Encana best practices mandates the use of impervious liners that extends under each storage tank and up the walls, permanently affixed to the top of the metal berm wall. Protrusions of piping that come through the liner include a fully sealed “boot” to prevent leakage.
ConstructionForm: (02A )
400802236
8/5/2015
All newly installed or replaced crude oil and condensate storage tanks will be designed, constructed, and maintained in accordance with National Fire Protection Association (NFPA) Code 30 (2008 version). Encana will maintain written records verifying proper design, construction, and maintenance, and will make these records available for inspection by the Director. In addition, onsite inspections are conducted internally to insure guidelines are met.
ConstructionForm: (02A )
400802236
8/5/2015
Per Rule 604.c.(2)A.. The pad will be constructed in such a manner that noise mitigation may be installed and removed without disturbing the site or landscaping.
ConstructionForm: (02A )
400802236
8/5/2015
All work will be during daylight hours, so no lights will be used.
Emissions mitigationForm: (02A )
400802236
8/5/2015
Per Rule 604.c(2)F Encana will follow and comply with all leak detection and repair  and storage tank emission management plan conditions as required by Colorado Air Quality Control Commission Regulation Number 7.  This will include at least monthly Audible, Visual and Olfactory (AVO) inspections of the components and tanks at our Production Facilities at most weekly or at least monthly starting on January 1, 2015.  In addition, Encana will perform infra-red camera inspections of these components and the storage tanks at most monthly or at least annually.