LOCATION441276Antelope CPF
13-21 Pad
BONANZA CREEK ENERGY OPERATING COMPANY LLC
8960
AC
4/15/2026
WILDCAT
99999
WELD  123
NESW 21 5N62W 6
441276View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400773482
03/24/2015
Added the statement "We will build out and utilize the Antelope CPF 13-21 Pad to receive the production from the Antelope 14-21 Pad and the State Antelope K-28 Pad. The equipment on the Antelope CPF 13-21 Pad will be installed in an incremental basis as there is additional work in the area that has not been specifically planned or scheduled at this time. The final equipment listing for this location will be reported to the COGCC on a sundry when it is available. The Antelope 14-21 Pad and the State Antelope K-28 Pad will be drilled and completed sequentially allowing for the possibility of equipment adjustment in the process. Due to the fact that the production from these two pads will be routed to the Antelope CPF 31-21 Pad a limited amount of facilities will be installed on the pads. The final equipment listing for these pads will also be reported on a sundry to accurately reflect as-built conditions when a final list can be compiled" to the Submit tab.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
ConstructionForm: (02A )
400773482
3/27/2015
The following procedure describes BCEOC standard construction practices for setting a partially buried pre-cast cement water vault and new tank battery construction. 1) The excavation will first be lined with 4” of clay or other low permeability soil. 2) A 30 mil liner will be installed on top of the low permeability soil. The 30 mil liner will be a contiguous liner which will underlay the entire tank battery. 3) The tank battery / water vault liner will be keyed into a galvanized steel containment ring installed surrounding the tank battery. 4) Sand bedding will be installed to protect the synthetic liner prior to placing equipment in the containment area.