Storm Water/Erosion Control | Form: (02A ) 400436169 10/8/2013 | This Stormwater Management Plan contains required elements associated with PDC’s construction activities for Area 2, as defined in the CDPS General Permit for Stormwater Discharges Associated with Construction Activity, Authorization to Discharge Under the Colorado Discharge Permit System (Permit No. COR-030000, re-issued and effective July 1, 2007).BMPs for sediment and erosion control will be accomplished through a combination of construction techniques, vegetation and re-vegetation, administrative controls, and structural features. |
Storm Water/Erosion Control | Form: (02A ) 400547420 3/17/2014 | This Stormwater Management Plan contains required elements associated with PDC’s construction activities for Area 2, as defined in the CDPS General Permit for Stormwater Discharges Associated with Construction Activity, Authorization to
Discharge Under the Colorado Discharge Permit System (Permit No. COR-030000, reissued and effective July 1, 2007).BMPs for sediment and erosion control will be accomplished through a combination of construction techniques, vegetation and revegetation, administrative controls, and structural features. |
Material Handling and Spill Prevention | Form: (02A ) 400547420 3/17/2014 | To prevent adverse impacts to shallow groundwater, buried produced water vault shall be constructed of fiberglass and installed above an impermeable synthetic or geosynthetic liner system which shall be tied back into the surface liner. |