COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A )
400440261
8/6/2013
a Form 15 Pit Permit will be required for the fresh water storage pit if any portion of the pit is constructed on fill.
Reclamation SpecialistForm: (04 )
401127740
2/10/2017
Carrizo requesting variance for five (5) years. The attached agreement with surface owner only provides to a waiver for five (5) years, with a termination date of 09/20/2021. COGCC grants approval of 502.b variance up until 09/20/2021.
Reclamation SpecialistForm: (04 )
401127740
2/10/2017
The private agreement embodied in the Surface Owner Waiver document attached to this Sundry does not modify or limit Carrizo’s responsibilities and obligations to comply with COGCC Rules and the Oil and Gas Conservation Act except for those Rules for which a Variance is explicitly granted here. Likewise, COGCC’s approval of this variance does not impair or modify any private agreements between Carrizo and the surface owners of these locations.
Reclamation SpecialistForm: (04 )
401127740
5/3/2017
COGCC’s approval of this variance request explicitly does not relieve Carrizo from compliance with COGCC’s “Notice to Operators: Procedures for Preset Conductors” (dated September 1, 2016 and revised October 6, 2016) where applicable.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400440261
10/4/2013
Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use. Fresh Water Storage Pit shall contain fresh water only and signage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source.Operator will participate in the Colorado Oil & Gas Association Voluntary Baseline Groundwater Quality Sampling Program.Operator will implement interim reclamation measures immediately after construction of the location to stabilize cut and fill slopes, stabilize the topsoil and spoil stockpiles, establish desirable vegetation and control weeds on the location. A Form 15 Pit Report will be submitted within 30 days of construction of the fresh water storage pit.
Pre-ConstructionForm: (02A )
400440261
10/4/2013
The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage Pit.
Storm Water/Erosion ControlForm: (02A )
400440261
10/4/2013
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing.
Material Handling and Spill PreventionForm: (02A )
400440261
10/4/2013
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids. Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit/Pond.
ConstructionForm: (02A )
400440261
10/4/2013
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.