Planning | Form: (02A ) 400428096 9/25/2013 | Maximize equipment and wellhead setbacks from occupied buildings and residences to the extent feasible and practicable, as determined by Encana. |
Planning | Form: (02A ) 400428096 9/25/2013 | Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the well-site for informational purposes only, which Encana may revise from time to time during operations:
a) A summary of planned operations, including identified access points and operational timeline, for posting to a local community information web-page
b) A site plan for site preparation, mobilization and demobilization
c) A plan for interim reclamation and vegetation of the site and final reclamation of the site
d) A plan for noise, light and dust mitigation, to the extent feasible
e) A traffic management plan
f) Updates of this information if any change during operations |
Community Outreach and Notification | Form: (02A ) 400428096 9/25/2013 | Prior to commencement of any new drilling or completion operations, provide notification to landowners within one-half (1/2) mile of the well-site. |
Construction | Form: (02A ) 400428096 9/25/2013 | Utilize steel-rim berms around tanks and separators instead of sand or soil berms |
Emissions mitigation | Form: (02A ) 400428096 9/25/2013 | Utilize a high-low pressure vessel (HLP) and vapor recovery unit (VRU) for new wells drilled. Encana may remove the VRU system at such time Encana determines that the VRU system is no longer necessary due to reduced emission recoveries and/or efficiencies, but no earlier than one (1) year after the new well is drilled |
Drilling/Completion Operations | Form: (02A ) 400428096 9/25/2013 | Utilize closed-loop systems for drilling and completion operations to minimize the need for earthen pits |