| Construction | Form: (02A ) 400447779 9/13/2013 | Kerr-McGee will create secondary containment by constructing an earthen berm between the tank battery berm and the canal that is 155’ to the N to further protect the stream. |
| Planning | Form: (04 ) 403369415 4/28/2023 | Site lighting shall be shielded and directed downward and inward toward operations to avoid glare on public roads and nearby Building Units. |
| Dust control | Form: (04 ) 403369415 4/28/2023 | Dust control Water will be placed on dirt access roads to mitigate dust as needed. |
| Noise mitigation | Form: (04 ) 403369415 4/28/2023 | Noise levels associated with the gas lift installation will be compliant with the Maximum Permissible Noise Levels pursuant to COGCC Rule 423 |
| Odor mitigation | Form: (04 ) 403369415 4/28/2023 | Closed, upright tanks are being utilized to mitigate odor. |