Construction | Form: (02A ) 400428075 7/12/2013 | The ditch labeled 27 on the Location Drawing will be rerouted and converted to subsurface pipe. Oil and gas operations will not interfere with the pipe. |
Planning | Form: (02A ) 400862474 9/17/2015 | 803. Lighting: Use of light supply is not anticipated at this site. If it is needed, to the extent practicable, site lighting shall be directed downward and inward and shielded so as to avoid glare on public roads and Building Units within one thousand (1000) feet. |
Planning | Form: (02A ) 400862474 9/17/2015 | No odors are anticipated during the interim reclamation process. |
General Housekeeping | Form: (02A ) 400862474 9/17/2015 | 604c.(2).P. Removal of Surface Trash: A commercial size trash bin for removing debris will be located on site. This bin will be for use by all parties affiliated with the operation. |
Dust control | Form: (02A ) 400862474 9/17/2015 | 805.c. Dust: Water will be placed on dirt access roads to mitigate dust as needed. If feasible, magnesium chloride will also be used as needed on access roads to further abate dust. Dust will be managed at all times. |
Noise mitigation | Form: (02A ) 400862474 9/17/2015 | 604c.(2).A. Noise: Interim Reclamation of this site will began upon approval of this amended 2A application. Reclamation activities will be conducted during daylight hours reducing noise impacts to adjacent landowners. An existing berm is located along County Road 4 to serve as mitigation. |