Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION433001State Seventy Holes
T-6 Pad
BONANZA CREEK ENERGY OPERATING COMPANY LLC
8960
AC
8/1/2024
WATTENBERG
90750
WELD  123
SESE 6 4N62W 6
433001View Related
 
COGIS - Conditions of Approval Results
No records to display.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
ConstructionForm: (02A )
400393318
5/19/2013
Bonanza Creek Energy Best Management Practices for Installation of Cement Water Vaults at locations Associated with Shallow Groundwater The following procedure describes construction practices for setting a partially buried pre-cast cement water vault on locations characterized as containing shallow depth to groundwater. 1) The excavation will first be lined with 4” of clay or other low permeability soil. 2) A 30 mil liner will be installed on top of the low permeability soil. The 30 mil liner will be a contiguous liner which will underlay the entire tank battery. 3) The tank battery / water vault liner will be keyed into a galvanized steel containment ring installed surrounding the tank battery. 4) Sand bedding will be installed to protect the synthetic liner prior to placing equipment in the containment area.
Drilling/Completion OperationsForm: (04 )
400703890
11/25/2014
Bonanza Creek Energy acknowledges and will comply with the “COGCC Policy On the Use of Modular Large Volume Tanks in Colorado” dated June 13, 2014.