Site Specific | Form: (02A ) 400385696 5/10/2013 | For sound impact: the rig we use has quiet mufflers on it and we put up hay bales as a sound buffer for drilling, fracing, and light abatement. During production we use mufflers on any compressor and have encompassed the compressor with sound walls if we have trouble meeting the noise requirements. |
Storm Water/Erosion Control | Form: (02A ) 400385696 5/10/2013 | This Stormwater Management Plan contains required elements associated with PDC’s construction activities for Area 2, as defined in the CDPS General Permit for Stormwater Discharges Associated with Construction Activity, Authorization to Discharge Under the Colorado Discharge Permit System (Permit No. COR-030000, re-issued and effective July 1, 2007).BMPs for sediment and erosion control will be accomplished through a combination of construction techniques, vegetation and re-vegetation, administrative controls, and structural features. |