| Drilling/Completion Operations | Form: (02A ) 400262484 4/20/2012 | Kerr McGee will create secondary containment by constructing an earthen berm between the PAD site and East Neres Canal, located approximately 340' W of the PAD site to further protect the surface water. |
| Material Handling and Spill Prevention | Form: (02A ) 400289800 7/22/2012 | Kerr-McGee will create a secondary containment by constructing an earthen berm between the PAD site and East Neres Canal, located approximately 340' W of the PAD site to further protect the surface water. |