LOCATION427788Albertson
G15 7101
QB ENERGY OPERATING LLC
10844
AC
11/1/2025
MESAGAR
54310
GARFIELD  045
SWNE 15 7S101W 6
427788View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400245174
01/30/2012
SITE SPECIFIC COAs: Operator must ensure 110 percent secondary containment for any volume of fluids contained at well site during drilling and completion operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures (i.e., best management practices (BMPs) associated with stormwater management) sufficiently protective of nearby surface water. Any berm constructed at the well pad location will be stabilized, inspected at regular intervals (at least every 14 days), and maintained in good condition. Operator must implement best management practices to contain any unintentional release of fluids, including any fluids conveyed via temporary surface pipelines or permanent buried pipelines. The moisture content of any drill cuttings in a cuttings pit, trench, or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts. At the time of closure, the drill cuttings must also meet the applicable standards of table 910-1. Flowback and stimulation fluids must be sent to tanks, separators, or other containment/filtering equipment before the fluids can be placed into any pipeline or pit located on the well pad or into tanker trucks for offsite disposal. The flowback and stimulation fluid tanks, separators, or other containment/filtering equipment must be placed on the well pad in an area with additional downgradient perimeter berming. The area where flowback fluids will be stored/reused must be constructed to be sufficiently impervious to contain any spilled or released material.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
WildlifeForm: (02A )
400245174
2/19/2012
Restrict post development, daily well site visitations to the hours between 9:00am and 4:00pm and between 12:01am and 4:00am for the winter period between January 1 and April 15 for elk winter range excluding safety or fluid management visits. Establish company guidelines to minimize wildlife mortality from vehicle collisions on roads. Avoid aggressive non-native grasses and shrubs in mule deer and elk habitat restoration. Encana intends to use a seed mix during interim reclamation that’s wildlife friendly.