LOCATION425164Herrell
17-22
PDC ENERGY INC
69175
CL
4/7/2023
WATTENBERG
90750
WELD  123
NWNE 22 7N66W 6
425164View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400188727
08/16/2011
Operator must submit a Waste Management Plan meeting the general requirements of Rule 907.a. for the land application of drill cuttings. Submit the Waste Management Plan on a Form 4 Sundry Notice via email to ogccenvirosundry@state.co.us.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02A )
400188727
8/31/2011
Use a closed-loop drilling mud system to preclude the use of an earthen reserve pits when available.
PlanningForm: (02A )
400188727
8/31/2011
When feasible develop multiple well sites by using directional drilling to reduce cumulative impacts and adverse impacts on wildlife resources.
Final ReclamationForm: (02A )
400188727
8/31/2011
All surface restoration shall be accomplished to the satisfaction of Owner. All reseeding shall be done with grasses consistent with the Rocky Mountain native mix or other grasses reasonably requested by surface owner and during planting period suggested by Owner. Final reclamation shall be completed to the reasonable satisfaction of the Owner as soon as practical after installation (weather permitting) and in accordance with regulatory agency standards (BLM/COGCC).
Storm Water/Erosion ControlForm: (02A )
400188727
8/31/2011
Use water bars, and other measures to prevent erosion and non-source pollution. Implement and maintain BMPs to control stormwater runoff in a manner that minimizes erosion, transport of sediment offsite, and site degradation. Co-locate gas and water gathering lines whenever feasible, and mitigate any erosion problems that arise due to the construction of any pipeline(s).
ConstructionForm: (02A )
400188727
8/31/2011
Remove only the minimum amount of vegetation necessary for the construction of roads and facilities. Conserve topsoil during excavation and reuse as cover on disturbed areas to facilitate regrowth of vegetation. No construction or routine maintenance activities will be performed during periods when the soil is too wet to adequately support construction equipment.
Interim ReclamationForm: (02A )
400188727
8/31/2011
Utilize only such area around each producing well as is reasonably necessary. Restore the remainder of the well site location to its original condition within a reasonable time after the completion of operations. All reseeding shall be done with grasses consistent with the Rocky Mountain native mix or other grasses reasonably requested by surface owner and during planting period suggested by Owner.