| Wildlife | Form: (02A ) 400138976 5/15/2011 | Wildlife BMPs
Minimize the number, length and footprint of oil & gas development roads
Use existing routes where possible
Combine utility infrastructure planning (gas, electric & water) when possible with roadway
planning to avoid separate utility corridors
Coordinate Employee transport when possible
Reduce visits to well-sites through remote monitoring (i.e. SCADA) and the use of multi-function
contractors. Maximize use of state-of-the-art drilling technology (e.g., high efficiency rigs, coiledtubing
unit rigs, closed-loop or pitless drilling, etc.) to minimize disturbance.
Reclaim mule deer and elk habitats with native shrubs, grasses, and forbs appropriate to the
ecological site disturbed. |
| Construction | Form: (02A ) 400138976 5/15/2011 | CONSTRUCTION/RECLAMATION
Terminal Containment
Diversions
Run-On Protection
Tracking
Benching
Terracing
ECM (Erosion Control Mulch)
ECB (Erosion Control Blanket)
Check Dams
Seeding
Mulching
Water Bars
Stabilized Unpaved Surfaces (Gravel)
Stormwater & Snow Storage Containment
Scheduling
Phased Construction
Temporary Flumes
Culverts with inlet & outlet protection
Rip Rap
TRM (Turf Reinforcement Mats)
Maintenance
Scheduling
Phased Construction
Fueling BMP's
Waste Management BMP's
Materials Handling BMP's |
| Pre-Construction | Form: (02A ) 400138976 5/15/2011 | PRECONSTRUCTION
Wattles
Silt Fence
Vegetation Buffers
Slash
Topsoil Windrows (diversions & ROP's)
Scheduling
Phased Construction |
| Interim Reclamation | Form: (02A ) 400138976 5/15/2011 | POST CONSTRUCTION/RECLAMATION
Maintenance
Revegetation Monitoring
BMP maintenance & monitoring
Weed Management |