OGLA | Form: (02A ) 400130342 2/7/2011 | No portion of any pit that will be used to hold liquids shall be constructed on fill material, unless the pit and fill slope are designed and certified by a professional engineer, subject to review and approval by the director prior to construction of the pit. The construction and lining of the pit shall be supervised by a professional engineer or their agent. |
OGLA | Form: (02A ) 400130342 2/7/2011 | Due to the shallow soils and underlying fractured bed rock the following will apply: Location is in a sensitive area because of potential for adverse impacts to ground water/surface water; therefore all pits will be lined. |
OGLA | Form: (02A ) 400130342 2/7/2011 | Location is on steep slopes; therefore the cut and fill slopes should be constructed in such a manner to manage site drainage and slope stability. The slopes should be stabilized immediately after the location has been constructed. |