| OGLA | Form: (02A) 400094844 10/19/2010 | Access road will be constructed such that any potential seasonal runoff through the drainage that runs west to east across Section 36 will not be impeded. Appropriate measures may include, but not be limited to appropriate sized culvert(s) to allow sufficient flow beneath the access road. Low water crossings will be constructed to prevent sediment from the access road from entering the drainage. |
| OGLA | Form: (02A) 400094844 10/19/2010 | Site-specific best management practices must be implemented to prevent fluid and/or sediment runoff from the access road from entering the drainage that runs west to east across Section 36. |
| OGLA | Form: (02A) 400094844 10/19/2010 | Provide notice to COGCC 48 hours prior to the commencement of construction activities. |