Site Specific | Form: (02A ) 400091828 10/14/2010 | OPERATOR MUST IMPLEMENT SITE-SPECIFIC BEST MANAGEMENT PRACTICES IN ACCORDANCE WITH GOOD ENGINEERING PRACTICES, INCLUDING BUT NOT LIMITED TO CONTRUCTION OF A BERM OR DIVERSION DIKE, SITE GRADING, OR OTHER COMPARABLE MEASURES, SUFFICIENT TO PROTECT GROUND WATER WHICH IS 5 FEET FROM DEPTH OF THE OIL AND GAS LOCATION FROM A RELESE OF DRILLING, COMPLETIION, PRODUCED FLUIDS AND CHEMICAL PRODUCTS. |
Planning | Form: (02A ) 400559405 3/31/2014 | This pad location is located in a rural rangeland area. The nearest building unit is located 2060’ away. |