Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION412995Aloha Mula
2
WIEPKING-FULLERTON ENERGY LLC
96340
AC
12/1/2025
GREAT PLAINS
32756
LINCOLN  073
SWSE 19 10S55W 6
412995View Related
 
COGIS - Conditions of Approval Results
No records to display.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PROPOSED BMPsForm: (07 )
0
1/23/2012
Stormwater BMP Plan Wiepking - Fullerton Energy, L.L.C. 4600 S. Downing St Englewood, CO 80113 303 - 789 -1798 • 303 - 761 -9067 (fax) Certification to Discharge Under CDPS General Permit COR -03000 Stormwater Discharges Associated with Construction Certification Number COR 39788 Description of Well Site and Construction Area 1 -3 acre site with access road for drilling of oil and gas well. Terrain is flat with native grass and sagebrush. No receiving waters will be affected by well pad. Drilling pits closed and reclaimed with the drillsite reseeded within 6 months weather permitting. Silt fences will be installed on low side site of drill site. Topsoil will be separated and spread on drill site as final operation before reseeding operations. To prevent soil erosion site will be disked and straw crimped in or manure spread. Stormwater Management Plan (SWMP) is on file in Wiepking - Fullerton Energy, L.L.C. office. Fkkov-cA W '4o9 Cog O@- Spill Prevention, Control and Countermeasure Plan is on file in Wiepking- Fullerton Energy, L.L.C. office.