| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | Stormwater BMP Plan
Wiepking - Fullerton Energy, L.L.C.
4600 S. Downing St
Englewood, CO 80113
303 - 789 -1798
• 303 - 761 -9067 (fax)
Certification to Discharge
Under
CDPS General Permit COR -03000
Stormwater Discharges Associated with Construction
Certification Number COR 39788
Description of Well Site and Construction Area
1 -3 acre site with access road for drilling of oil and gas well. Terrain is flat
with native grass and sagebrush. No receiving waters will be affected by
well pad. Drilling pits closed and reclaimed with the drillsite reseeded within
6 months weather permitting. Silt fences will be installed on low side site of
drill site. Topsoil will be separated and spread on drill site as final operation
before reseeding operations. To prevent soil erosion site will be disked and
straw crimped in or manure spread.
Stormwater Management Plan (SWMP) is on file in Wiepking - Fullerton
Energy, L.L.C. office.
Fkkov-cA
W '4o9
Cog O@-
Spill Prevention, Control and Countermeasure Plan is on file in Wiepking-
Fullerton Energy, L.L.C. office.
|