| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | Noble Energy, Inc.
Best Management Practices Summary
Spill Prevention Control and Countermeasures (SPCC) plans are in place to address any possible
spill associated with Oil & Gas operations throughout the state of Colorado in accordance with
CFR 112.
Housekeeping will consist of neat and orderly storage of materials and fluids. Wastes will be
temporarily stored in sealed containers and regularly collected and disposed of at offsite, suitable
facilities. If spills occur prompt cleanup is required to minimize any commingling of' waste
materials with stormwater runoff. Routine maintenance will be limited to fueling and lubrication
of equipment. Drip pans will be used during routine fueling and maintenance to contain spills or
leaks. Any waste product from maintenance will be containerized and transported offsite for
disposal or recycling. There will be no major equipment overhauls conducted onsite. Equipment
will be transported offsite for major overhauls. Cleanup of trash and discarded materials will be
conducted at the end of each work day. Cleanup will consist of patrolling the roadway, access
areas, and other work areas to pickup trash, scrap debris, other discarded materials, and any
contaminated soil. These materials will be disposed of properly.
RECEIVED
JUL 131009
COGCC
Stormwater management plans (SWMP) are in place to address construction, drilling and
operations associated with Oil & Gas development throu_hout the state of Colorado in accordance
with Colorado Department of Public Health and Environment (CDPHE) General Pennit No.
COR- 039527. BMP's will be constructed around the perimeter of the site prior to, or at the
beginning of construction. BMP's used will vary according to the location, and will remain in
place until the pad reaches final reclamation.
|