Environmental | Form: (04 ) 400678095 9/15/2014 | PRODUCED WATER OR FLOWBACK WATER OR OTHER EXPLORATION AND PRODUCTION WASTE SHALL NOT BE TEMPORARILY STORED IN MODULAR LARGE VOLUME STORAGE TANKS (MLVSTs). PRODUCED WATER OR FLOWBACK WATER SHALL BE TEMPORAILY STORED IN FRAC TANKS. |
Environmental | Form: (04 ) 400678095 9/15/2014 | COA- APPROVAL OF THIS PLAN IS CONTINGENT UPON ANALYTICAL LABORATORY RESULTS FOR REPRESENTATIVE SAMPLES ENCANA WATER FROM LOCATION ID: 334939 and URSA Location ID 418828
RESULTS SHALL BE SUBMITTED TO THE COGCC WITHIN 45 DAYS OF APPROVAL OF THIS PLAN. ANALYTICAL LABORATORYANALYSIS SHALL INCLUDE:
• VOLATILE ORGANIC COMPOUNDS EPA METHOD 624 (GC/MS)
• SEMI-VOLATILE ORGANIC COMPOUNDS EPA METHOD 625 (GC/MS)
• DISSOLVED METALS EPA METHOD 200.7 (ICP)
• DISSOLVED INORGANICS (NON-METALS) EPA METHOD 300.0 (IC)
o Br,Cl,F,Nitrate/Nitrite, Sulfate
• GENERAL WATER QUALITY PARAMETERS
o SPECIFIC CONDUCTANCE EPA METHOD 300.0 (IC)
o HARDNESS EPA METHOD 130.1
o TOTAL DISSOLVED SOLIDS EPA METHOD 160.1
o pH EPA METHOD 150.2
o ALKALINITY EPA METHOD 310.1
• GROSS ALPHA AND BETA RADIOACTIVITY EPA METHOD 900.1
|
Environmental | Form: (04 ) 400743057 12/8/2014 | 1) Netting can be removed during the winter (as requested) as long as the pit is frozen
during the winter. If part of the pit does not freeze due to pumping or discharge of
produced water into the pit, then that section of the pit must be netted and isolated so
that no access to the water is possible for birds and other wildlife.
**********
2) It is the responsibility of the operator to protect wildlife from having access to (unfrozen)
water of the pit.
Nets shall be reinstalled if condensate or oil is observed on the pit. Nets shall be installed if pits are accessible to wildlife.
**********
3) Netting needs to be reinstalled over fluid pits upon thawing of the pits' contents. Nets will be reinstalled before Sage Grouse nesting season begins on March 1st. |
Permit | Form: (04 ) 401246064 3/31/2017 | The operator-of-record of this location is subject to the September 1, 2017 extended deadline granted by this variance to comply with the March 1, 2017 requirements of the COGCC Notice to Operators: Procedure for Preset Conductors (rev October 6, 2016) to have performed one of the following options: (1) plug the conductors and perform reclamation, (2) request to keep the conductors and provide additional financial assurance, or (3) submit a Rule 502.b variance for an alternative plan. |