| OGLA | Form: (02A) 401553107 06/24/2018 | Potential odors associated with the completions process and/or with long term production operations must be controlled/mitigated. |
| OGLA | Form: (02A) 401553107 06/24/2018 | The moisture content of water/bentonite based mud (WBM) generated drill cuttings managed onsite shall be kept as low as practicable to prevent accumulation of liquids greater than de minimis amounts. After drilling and completion operations have been completed, if any of the WBM drill cuttings will remain on the well pad location (cuttings management area, the cut portion of the pad, cuttings trench, dry cuttings drilling pit), they must be sampled and meet the applicable standards of Table 910-1. No liners (if used) are allowed to be disposed of with the drill cuttings. After the drill cuttings have been amended (if necessary) and placed on the well pad, sampling frequency of the drill cuttings (to be determined by the operator) shall be representative of the material left on location. No offsite disposal of cuttings to another oil and gas location shall occur without prior approval of a Form 4 Sundry Notice specifying disposal location and waste characterization method. Commercial disposal of drill cuttings will require notification (no prior approval) to COGCC via a Form 4 Sundry Notice.
Flowback and stimulation fluids must be sent to enclosed tanks, separators, or other containment/filtering equipment before the fluids can be placed into any pipeline or open top containment located on the well pad; or into tanker trucks for offsite disposal. No open top tanks can be used for initial flowback fluids containment. The flowback and stimulation fluid tanks, separators, or other containment/filtering equipment must be placed on the well pad in an area constructed to be sufficiently impervious to contain any spilled or released material. No additional downgradient berming is required if operator constructs a sufficiently sized perimeter berm. |
| OGLA | Form: (02A) 401553107 06/24/2018 | The access road will be maintained as to not allow any sediment to migrate from the access road to nearby surface water or any drainages leading to surface water.
Operator shall submit an as-built drawing that shows how the 3-phase material is collected and leaves the NPR A03-596 Pad and also provide a schematic diagram showing the nearby production facility with the 3-phase entry point; within 60 calendar days of construction of the production equipment on either or both locations. |
| OGLA | Form: (02A) 401553107 06/24/2018 | In addition to the notifications required by COGCC listed in the Northwest Notification Policy (Notice of Intent to Construct a New Location, Notice of Intent to Spud Surface Casing, and Notice of Intent to Commence Hydraulic Fracturing Operations) and Rule 316C. COGCC Form 42. FIELD OPERATIONS NOTICE (a. Notice of Intent to Conduct Hydraulic Fracturing Treatment and c. Notice of Construction or Major Change); operator shall notify the COGCC 48 hours prior to pipeline testing (flowlines from wellheads to separators to tanks; permanent buried take away pipelines; and/or any temporary surface lines used for hydraulic stimulation and/or flowback operations) using the Form 42 (as described in Rule 316C.m. Notice of Completion of Form 2/2A Permit Conditions). The appropriate COGCC individuals will automatically be email notified. |
| Environmental | Form: (04) 402046038 05/21/2019 | IF LOCATIONS ARE IN A SENSITIVE AREA BECAUSE OF ITS PROXIMITY TO
SURFACE WATER OPERATOR MUST ENSURE 110 PERCENT SECONDARY
CONTAINMENT FOR ANY VOLUME OF FLUIDS CONTAINED AT THE WATER
HANDLING FACILITY SITE DURING NATURAL GAS DEVELOPMENT ACTIVITIES
AND OPERATIONS; INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION OF A
BERM OR DIVERSION DIKE, DIVERSION/COLLECTION TRENCHES WITHIN AND/OR OUTSIDE OF BERMS/DIKES, SITE GRADING, OR OTHER COMPARABLE EASURES (I.E., BEST MANAGEMENT PRACTICES (BMPS) ASSOCIATED WITH STORMWATER MANAGEMENT) SUFFICIENTLY PROTECTIVE OF NEARBY SURFACE WATER. ANY BERM CONSTRUCTED AT THE WELL PAD LOCATION WILL BE STABILIZED, INSPECTED AT REGULAR INTERVALS (AT LEAST EVERY
14 DAYS), AND MAINTAINED IN GOOD CONDITION. |
| Environmental | Form: (04) 402046038 05/21/2019 | OPERATOR MUST IMPLEMENT BEST MANAGEMENT PRACTICES TO CONTAIN CONVEYED VIA TEMPORARY SURFACE PIPELINES. |
| Environmental | Form: (04) 402046038 05/21/2019 | TERMINATION OF ACITIVITES: BOTH CAERUS AND BERRY SHALL NOTIFY THE COGCC VIA SUNDRY IMMEDIATELY UPON TERMINATION OF ACTIVITIES. |
| Environmental | Form: (04) 402046038 05/21/2019 | PRODUCED WATER OR FLOWBACK WATER OR OTHER EXPLORATION AND RODUCTION WASTE SHALL NOT BE TEMPORARILY STORED IN MODULAR LARGE VOLUME STORAGE TANKS (MLVSTs). PRODUCED WATER OR FLOWBACK WATER SHALL BE TEMPORAILY STORED IN FRAC TANKS. |
| Environmental | Form: (04) 402089921 06/28/2019 | Extension until July 31, 2019 is approved. COAs on Document ID: 402046693 apply to this extension. |
| Environmental | Form: (04) 402089921 06/28/2019 | Within 6-months of completion of the Water Share, all temporary above ground conveyance lines, pumps, valves, and any other associated equipment and materials shall be removed and areas reclaimed. |
| Environmental | Form: (04) 402119236 07/31/2019 | Within 45-days of this Sundry approval provide a site layout drawing for 10-37, 500-bbl. temporary steel frac tanks, located on the A03.
On future water share requests, the site layout drawing for the proposed temporary steel frac tanks shall be provided with the original submittal. |
| Environmental | Form: (04) 402119236 07/31/2019 | Within 6-months of completion of the Water Share, all temporary above ground conveyance lines, pumps, valves, and any other associated equipment and materials shall be removed and areas reclaimed. |
| Environmental | Form: (04) 402119236 07/31/2019 | IF LOCATIONS ARE IN A SENSITIVE AREA BECAUSE OF ITS PROXIMITY TO SURFACE WATER OPERATOR MUST ENSURE 110 PERCENT SECONDARY CONTAINMENT FOR ANY VOLUME OF FLUIDS CONTAINED AT THE WATER HANDLING FACILITY SITE DURING NATURAL GAS DEVELOPMENT ACTIVITIES AND OPERATIONS; INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION OF A ERM OR DIVERSION DIKE, DIVERSION/COLLECTION TRENCHES WITHIN
AND/OR OUTSIDE OF BERMS/DIKES, SITE GRADING, OR OTHER COMPARABLE MEASURES (I.E., BEST MANAGEMENT PRACTICES (BMPS) ASSOCIATED WITH STORMWATER MANAGEMENT) SUFFICIENTLY PROTECTIVE OF NEARBY SURFACE WATER. ANY BERM CONSTRUCTED AT THE WELL PAD LOCATION WILL BE STABILIZED, INSPECTED AT REGULAR INTERVALS (AT LEAST EVERY 14 DAYS), AND MAINTAINED IN GOOD CONDITION.
|
| Environmental | Form: (04) 402119236 07/31/2019 | OPERATOR MUST IMPLEMENT BEST MANAGEMENT PRACTICES TO CONTAIN CONVEYED VIA TEMPORARY SURFACE PIPELINES. |
| Environmental | Form: (04) 402119236 07/31/2019 | PRODUCED WATER OR FLOWBACK WATER OR OTHER EXPLORATION AND PRODUCTION WASTE SHALL NOT BE TEMPORARILY STORED IN MODULAR LARGE VOLUME STORAGE TANKS (MLVSTs). PRODUCED WATER OR
FLOWBACK WATER SHALL BE TEMPORARILY STORED IN FRAC TANKS.
|
| Environmental | Form: (04) 402119236 07/31/2019 | TERMINATION OF ACITIVITES: BOTH CAERUS AND TEP SHALL NOTIFY THE COGCC VIA SUNDRY IMMEDIATELY UPON TERMINATION OF ACTIVITIES. |
| Environmental | Form: (04) 402119236 07/31/2019 | TERMINATION OF ACTIVITIES: BOTH CAERUS AND TEP SHALL NOTIFY THE
COGCC VIA SUNDRY IMMEDIATELY UPON TERMINATION OF ACTIVITIES.
CAERUS AND BERRY WILL EACH SEPARATELY SUBMIT AN ANNUAL REPORT
TO THE COGCC SUMMARIZING THE TRANSFER OF PRODUCTION WATER
(BOTH AS TRANSFER AND RECEIVING OPERATOR) DURING THE CALENDAR
YEAR AND INCLUDING LABORATORY ANALYTICAL RESULTS FOR
REPRESENTATIVE SAMPLES(S) OF THE PRODUCTION WATER PROVIDED AS
THE TRANSFER/RECEIVER. THE ANNUAL REPORT SHALL BE SUBMITTED ON
OR BEFORE THE ANNIVERSARY OF THE FIRST DATE OF TRANSFER AND CAN BE
PART OF THE ANNUAL REPORT FOR FACILITY ID 120803.
|
| Environmental | Form: (04) 402169994 09/25/2019 | Sundry submitted to to satisfy a COA in Sundry Doc # 402119236 for 17 temporary frac tanks. All other COAs in Doc # 402119236 apply. |
| Environmental | Form: (04) 402266375 01/20/2020 | Both operators involved in the 2019 water share agreement shall ensure compliance with COAs for closure requirements, specifically regarding an annual report and analytical results. |
| Environmental | Form: (04) 402473553 08/27/2020 | Within 180 days of this Sundry approval, the operator shall advance a boring through the southwest bottom footprint of the former Pit Facility and through the fractured bedrock until groundwater is encountered. A groundwater monitoring well shall be installed to monitor the groundwater for Table 910- 1 constituents. |
| Environmental | Form: (04) 402473553 08/27/2020 | Within 180 days of this Sundry approval, the operator shall advance borings through the north bottom and southwest bottom footprints of the former Pit Facility. Continuous samples shall be collected, screened, and sampled for BTEX and TPH. It is anticipated that the total depth of the former Pit Facility is 12 feet. |
| Environmental | Form: (04) 402473553 08/27/2020 | If there are any visual, olfactory, or otherwise field screened detections of hydrocarbons in cuttings pile during cuttings operations, operator shall cease all activity, collect samples from impacted area for Table 910-1 constituents listed under Organic Compounds in Soil, and provide analytical results to COGCC via Form 4 Sundry Notice to be discussed before commencing with cuttings reuse. |
| Reclamation Specialist | Form: (04) 402473553 09/09/2020 | Pursuant to Rule 907.e.(2)H, Land treatment shall be conducted in a manner that does not preclude compliance with reclamation rules 1003 and 1004. If interim reclamation can not be completed within the timing requirements pursuant to Rule 1003.b, and/or continuous drilling or subsequent operations are not ongoing, then a Delayed Operations Interim Reclamaiton variance request will be required. |
| Environmental | Form: (04) 402613203 03/04/2021 | The COGCC grants a one-time extension of 90-days from the approval of this Form 4 Sundry Notice (doc #402613203) based on information provided by the Operator. The revised corrective action date for the two Conditions of Approval listed on doc #402473553 is now June 2, 2021. |