| OGLA | Form: (02A) 401402875 10/17/2017 | Operator shall pressure test pipelines (flowlines from wellheads to separators to tanks; and any temporary surface lines used for hydraulic stimulation and/or flowback operations) in accordance with Rule 1101.e.(1) prior to putting into initial service any temporary surface or permanent buried pipelines and following any reconfiguration of the pipeline network, and tested annually, unless agreed to by both parties that the flowlines can be managed under an approved COGCC variance. |
| OGLA | Form: (02A) 401402875 10/17/2017 | Potential odors associated with the completions process and/or with long term production operations must be controlled/mitigated. |
| OGLA | Form: (02A) 401402875 10/17/2017 | The moisture content of water/bentonite based mud (WBM) generated drill cuttings managed onsite shall be kept as low as practicable to prevent accumulation of liquids greater than de minimis amounts. After drilling and completion operations have been completed, if any of the WBM drill cuttings will remain on the well pad location (cuttings management area, the cut portion of the pad, cuttings trench, dry cuttings drilling pit), they must be sampled and meet the applicable standards of Table 910-1. No liners (if used) are allowed to be disposed of with the drill cuttings. After the drill cuttings have been amended (if necessary) and placed on the well pad, sampling frequency of the drill cuttings (to be determined by the operator) shall be representative of the material left on location. No offsite disposal of cuttings to another oil and gas location shall occur without prior approval of a Form 4 Sundry Notice specifying disposal location and waste characterization method. Commercial disposal of drill cuttings will also require notification to COGCC via a Form 4 Sundry Notice.
Flowback and stimulation fluids must be sent to enclosed tanks, separators, or other containment/filtering equipment before the fluids can be placed into any pipeline or open top containment located on the well pad; or into tanker trucks for offsite disposal. No open top tanks can be used for initial flowback fluids containment. The flowback and stimulation fluid tanks, separators, or other containment/filtering equipment must be placed on the well pad in an area constructed to be sufficiently impervious to contain any spilled or released material. No additional downgradient berming is required if operator constructs a sufficiently sized perimeter berm. |
| OGLA | Form: (02A) 401402875 10/17/2017 | Operator must ensure secondary containment for any volume of fluids contained at the well site during drilling and completion operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures to be sufficiently protective of nearby surface water. Any berm reconstructed at the well pad location will be stabilized, inspected at regular intervals as required by CDPHE, and maintained in good condition. The design/build of any perimeter berm shall be sized, constructed, and compacted sufficiently to contain fluids during drilling operations, as well as all fluids contained in temporary frac tanks during completion operations.
The access road will be maintained as to not allow any sediment to migrate from the access road to nearby surface water or any drainages leading to surface water.
Strategically apply fugitive dust control measures to reduce fugitive dust and coating of vegetation and deposition in water sources.
Berms or other containment devices shall be constructed to be sufficiently impervious (corrugated steel with poly liner) to contain any spilled or released material around permanent condensate and produced water storage tanks.
Since permanent oil, condensate, or produced water storage tanks are not planned to be constructed on location, operator shall submit an as-built drawing that shows how the 3-phase material is collected and leaves the NPR K10-596 Pad, which also provides the distance to Middle Fork, and also provide a schematic diagram showing the MF Production facility with the 3-phase entry point; within 60 calendar days of construction of the production equipment on either or both locations. |
| OGLA | Form: (02A) 401402875 10/17/2017 | In addition to the notifications required by COGCC listed in the Northwest Notification Policy (Notice of Intent to Construct a New Location, Notice of Intent to Spud Surface Casing, and Notice of Intent to Commence Hydraulic Fracturing Operations) and Rule 316C. COGCC Form 42. FIELD OPERATIONS NOTICE (a. Notice of Intent to Conduct Hydraulic Fracturing Treatment and c. Notice of Construction or Major Change); operator shall notify the COGCC 48 hours prior to pipeline testing (flowlines from wellheads to separators to tanks; permanent buried take away pipelines; and/or any temporary surface lines used for hydraulic stimulation and/or flowback operations) using the Form 42 (as described in Rule 316C.m. Notice of Completion of Form 2/2A Permit Conditions). The appropriate COGCC individuals will automatically be email notified.
Operator will utilize, to the extent practical, all existing pipeline infrastructure for transfer of water for use in the hydraulic stimulation operations at this well pad. If temporary surface pipelines are needed, operator will utilize, to the extent practical, all existing access and other public roads, and/or existing pipeline right-of-ways, when placing/routing the temporary surface pipelines. This will reduce surface disturbance and fragmentation of wildlife habitat in the area. Operator shall submit a Form 4 Sundry Notice showing the proposed route of the temporary surface pipelines prior to placement for informational purposes only. |
| Environmental | Form: (04) 401576223 03/26/2018 | Cuttings may only be transported offsite for temporary storage on the D-23 site; temporary storage at other locations is not permitted.
Cuttings may be removed for final disposition as provided in Rule 907. |
| Environmental | Form: (04) 401576223 04/19/2018 | BMPS shall be inspected and maintained after precipitation events.
The Location perimeter berm is not considered secondary containment or a proper BMP for the E&P waste storage.
Operator shall be in compliance with Rule 907.a. |
| Environmental | Form: (04) 401576223 04/27/2018 | The moisture content of any drill cuttings transported from the N.PARACHUTE-65S96W Location to the K10-597 Location, placed at the K10-597 Location for temporary storage, transported to the N.PARACHUTE-65S96W Location of origin for treatment and reclamation shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts and to prevent spillage out of trucks during transport. |
| Environmental | Form: (04) 401576223 04/27/2018 | The Operator shall notify the COGCC EPS Staff (Alex Fischer) at alex.fischer@state.co.us and via a Sundry Form 4 when the transfer back to the N.PARACHUTE-65S96W Location begins. |
| Environmental | Form: (04) 401576223 04/27/2018 | Documentation as required by 907.b. shall be submitted for the Location via Form 4. |
| Environmental | Form: (04) 401576223 04/27/2018 | Financial assurance will be required for the onsite (K10) treatment of cuttings, if the treatment and management exceed three years from the approval date of the Sundry Document Number 401606637.
Treatment of Cuttings on K10 Pad will be subject to an approved Form 27 Site Investigation and Remediation Workplan. Form 27 shall be submitted within 2 weeks of approval of this Sundry. Form 27 shall include a Waste Management Plan. |
| Environmental | Form: (04) 402046034 05/21/2019 | Within 30-days of the Water Share approval provide the following:
Updated status of REMs 11356, 12949, and 7750.
Updated status of Spill/Release ID:440664. |
| Environmental | Form: (04) 402046034 05/21/2019 | IF LOCATIONS ARE IN A SENSITIVE AREA BECAUSE OF ITS PROXIMITY TO
SURFACE WATER OPERATOR MUST ENSURE 110 PERCENT SECONDARY
CONTAINMENT FOR ANY VOLUME OF FLUIDS CONTAINED AT THE WATER
HANDLING FACILITY SITE DURING NATURAL GAS DEVELOPMENT ACTIVITIES
AND OPERATIONS; INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION OF A
BERM OR DIVERSION DIKE, DIVERSION/COLLECTION TRENCHES WITHIN AND/OR OUTSIDE OF BERMS/DIKES, SITE GRADING, OR OTHER COMPARABLE MEASURES (I.E., BEST MANAGEMENT PRACTICES (BMPS) ASSOCIATED WITH STORMWATER MANAGEMENT) SUFFICIENTLY PROTECTIVE OF NEARBY SURFACE WATER. ANY BERM CONSTRUCTED AT THE WELL PAD LOCATION WILL BE STABILIZED, INSPECTED AT REGULAR INTERVALS (AT LEAST EVERY 14 DAYS), AND MAINTAINED IN GOOD CONDITION. |
| Environmental | Form: (04) 402046034 05/21/2019 | OPERATOR MUST IMPLEMENT BEST MANAGEMENT PRACTICES TO CONTAIN ANY UNINTENTIONAL RELEASE OF FLUIDS, INCLUDING ANY FLUIDS ONVEYED VIA TEMPORARY SURFACE PIPELINES. |
| Environmental | Form: (04) 402046034 05/21/2019 | TERMINATION OF ACITIVITES: BOTH CAERUS AND BERRY SHALL NOTIFY THE OGCC VIA SUNDRY IMMEDIATELY UPON TERMINATION OF ACTIVITIES. |
| Environmental | Form: (04) 402046034 05/21/2019 | PRODUCED WATER OR FLOWBACK WATER OR OTHER EXPLORATION AND PRODUCTION WASTE SHALL NOT BE TEMPORARILY STORED IN MODULAR LARGE VOLUME STORAGE TANKS (MLVSTs). PRODUCED WATER OR FLOWBACK WATER SHALL BE TEMPORAILY STORED IN FRAC TANKS. |
| Environmental | Form: (04) 402046034 05/21/2019 | Provide documentation that the operator has met the pressure test Form 2A COA requirements (see document 401402875). |
| Environmental | Form: (04) 402089910 06/28/2019 | Extension until July 31, 2019 is approved. COAs on Document ID: 402046034 apply to this extension. |
| Environmental | Form: (04) 402089910 06/28/2019 | Within 6-months of completion of the Water Share, all temporary above ground conveyance lines, pumps, valves, and any other associated equipment and materials shall be removed and areas reclaimed. |
| Environmental | Form: (04) 402226130 11/07/2019 | If there are any visual, olfactory, or otherwise field screened detections of hydrocarbons in cuttings pile during cuttings operations, operator shall cease all activity, collect samples from impacted area for TPH (DRO/GRO/BTEX) and Table 910-1 inorganic constituents, and provide analytical results to COGCC via Form 4 Sundry Notice to be discussed before commencing with cuttings reuse. |
| Environmental | Form: (04) 402279668 11/17/2023 | Operator submitted this form on 1/7/2020, ECMC processed this form on 11/17/2023. ECMC is processing this form only to complete the record; no approval or work should be implied from this form being passed. |