| Reclamation Specialist | Form: (04) 404283422 11/06/2025 | Approval/Passing of this Form is not an endorsement of the reclamation plan that has been attached/included; Location will need to meet 1000 series requirements in order to pass reclamation. If it is determined that reclamation is not progressing towards 1000 series standards, additional remedial efforts may be required; the reclamation plan should be updated based on the site’s conditions, and implemented in order to ensure standards are met. |
| Reclamation Specialist | Form: (04) 404283422 11/06/2025 | Soils to be placed over the impacted material during reclamation efforts shall be done so in accordance with Rule 1003.e.(2); Operator shall implement Best Management Practices to ensure that topsoil is replaced and protected in such a manner as to prevent mixing with subsoils, impacted materials or other contaminants. |
| Reclamation Specialist | Form: (04) 404283422 11/06/2025 | As to any future remedial efforts requiring excavation: topsoil salvage, soil segregation and protection of soils shall be performed in accordance with Rule 1002.b and 1002.c. |
| Reclamation Specialist | Form: (04) 404283422 11/06/2025 | In the event table 915-1 exceedances of EC, SAR, or pH boron remain, Operator's 915.b request to leave impacts in situ, and covered with a minimum of 7 feet of soil is approved. |
| Reclamation Specialist | Form: (04) 404283422 11/06/2025 | Location is active at time of review with no plan to conduct final reclamation. Approval of this 915.b is based on current site conditions, however, the reclamation plan will require updating in the event surface conditions change, impacts are discovered during future facility closure operations, or future spill/remediation projects. |
| Reclamation Specialist | Form: (04) 404283422 11/06/2025 | Temporary, site specific stormwater and erosion control BMPs shall be installed and maintained per good engineering practices during construction activities. BMPs shall also be maintained until long-term stabilization has been achieved; if it is determined that a specific BMP is insufficient to minimize erosion, degradation and sediment transport, or cannot be implemented per installation specification, or maintained in effective operating condition, then alternative BMPs that are better suited to meet the site’s conditions should be considered and applied, or used in conjunction. |