| Reclamation Specialist | Form: (04) 401303068 06/19/2018 | 1) Approval of this form is an approval of the NTO request only. Areas detailed in the attached map are not a final delineation of the exact areas needed for production operations or interim reclamation, and are only an estimate. Future assessments regarding the size and extent of the areas needed for production may be determined on the ground by reclamation staff during a field inspection.
2) Financial assurance bond will not be released until the location meets reclamation Rules, including vegetation standards.
3) Financial assurance bonds must be received within 45 days from this email notification. |
| OGLA | Form: (04) 401832086 11/27/2018 | Operator shall submit a Form 42 indicating the date that the 16" steel pipe was initially placed on location for use during infrastructure lease operations. The pipe cannot be stored for longer than three (3) years. |
| Reclamation Specialist | Form: (04) 403430978 06/16/2023 | Approval/Passing of the form 4 acknowledges that the Oil and Gas Conservation Commission has received the notice. Operator remains responsible for management of the Location, including Weed Management pursuant to Rules 1004.e and 606.c, and Stormwater Management pursuant to Rule 1002.f., until site receives a passing Final Reclamation inspection. A field inspection will be conducted at a future date to evaluate compliance with reclamation standards. |
| Reclamation Specialist | Form: (04) 403430978 06/16/2023 | Pursuant to Rule 1003.e.(3), Operator shall submit an Interim reclamation completion notice, Form 4, once Location has met COGCC 1003 standards. |