| Reclamation Specialist | Form: (04) 402735208 07/01/2021 | Stormwater:
Operator shall ensure storwmater and erosion control BMPs will be in place and in proper funcitoning condition.
If it is determined that a specific BMP is insufficient to mitigate degradation on a site, cannot be implemented per installation specification, or maintained in effective operating condition, then alternative BMPs that are better suited to meet the site's conditions should be considered and immediately applied, or used in conjunction. |
| Reclamation Specialist | Form: (04) 402735208 07/01/2021 | Approval/Passing of the form 4 acknowledges that the Oil and Gas Conservation Commission has received the notice. It is not an acknowledgement that reclamation has been passed. A field inspection will be conducted at a future date to evaluate compliance with reclamation standards. |