Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION335573N. Parachute
EF G29 595
QB ENERGY OPERATING LLC
10844
AC
5/1/2025
GRAND VALLEY
31290
GARFIELD  045
SWNE 29 5S95W 6
335573View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A )
400080090
8/16/2010
Location is in a sensitive area because of proximity to surface water (East Fork Parachute Creek to the north); therefore, operator must ensure 110 percent secondary containment for any volume of fluids contained at well site during drilling and completion operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures (i.e., BMPs associated with stormwater management) sufficiently protective of the nearby surface water.
OGLAForm: (02A )
400080090
8/16/2010
Operator must implement best management practices to contain any unintentional release of fluids.
OGLAForm: (02A )
400080090
8/16/2010
Location is in a sensitive area because of shallow groundwater; therefore either a lined drilling pit or closed loop system must be implemented.
OGLAForm: (02A )
400080090
8/16/2010
Location is in a sensitive area because of shallow groundwater; therefore any pits containing fluids (if constructed) must be lined.
OGLAForm: (02A )
400080090
8/16/2010
All pits containing fluids (if constructed; reserve pit, production pit, frac pit) must be lined.
OGLAForm: (02A )
400080090
8/16/2010
The moisture content of any drill cuttings in a cuttings pit, trench, or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts. At the time of closure, the drill cuttings must also meet the applicable standards of table 910-1.
OGLAForm: (02A )
400080090
8/16/2010
No portion of any pit that will be used to hold liquids shall be constructed on fill material, unless the pit and fill slope are designed and certified by a professional engineer, subject to review and approval by the director prior to construction of the pit. The construction and lining of the pit shall be supervised by a professional engineer or their agent. The entire base of the pit must be in cut.
EnvironmentalForm: (04 )
401074167
7/29/2016
Cuttings will need to be remediated for PAHs before burrying them, unless background samples from the same general area are provided showing elevated PAH constituents.
 
COGIS - Best Management Practice Results
No records to display.