LOCATION335428Benjamin Federal
28-12B2 (K28NW)
QB ENERGY OPERATING LLC
10844
AC
7/1/2025
MAMM CREEK
52500
GARFIELD  045
NESW 28 6S93W 6
335428View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400083575
09/20/2010
Location is in a sensitive area because of close proximity to surface water, therefore, operator must ensure 110 percent secondary containment for any volume of fluids contained at well site during drilling and completion operations.
OGLAForm: (02A)
400083575
09/20/2010
Operator must implement best management practices to contain any unintentional release of fluids.
OGLAForm: (02A)
400083575
09/20/2010
Location is in a sensitive area because of proximity to a domestic water well and shallow groundwater; therefore either a lined drilling pit or closed loop system must be implemented.
OGLAForm: (02A)
400083575
09/20/2010
Location is in a sensitive area because of proximity to a domestic water well and shallow groundwater; therefore production pits (if constructed) must be lined.
OGLAForm: (02A)
400083575
09/20/2010
The moisture content of any drill cuttings in a cuttings pit, trench, or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts. At the time of closure, the drill cuttings must also meet the applicable standards of table 910-1.
OGLAForm: (02A)
400083575
09/20/2010
No portion of any pit that will be used to hold liquids shall be constructed on fill material, unless the pit and fill slope are designed and certified by a professional engineer, subject to review and approval by the director prior to construction of the pit. The construction and lining of the pit shall be supervised by a professional engineer or their agent. The entire base of the pit must be in cut.
OGLAForm: (02A)
400083575
11/22/2010
Based on discussions at the EnCana/BLM Onsite (that took place on 10-14-10), the well pad configuration and possible size will likely change, as well as locations of tanks, separators, pipelines, etc.; therefore, operator must submit revised Location Drawing and Construction Layout Drawings via a Form 4 Sundry Notice to Dave Kubeczko for approval prior to starting construction of the well pad.
OGLAForm: (02A)
400083575
11/22/2010
Notify COGCC Oil and Gas Location Assessment (OGLA) Specialist for Western Colorado (Dave Kubeczko; email dave.kubeczko@state.co.us; phone 970-309-2514) 48 hours prior to start of construction.
AgencyForm: (04)
400463688
11/12/2013
Location has multiple producing wells. Interim relcamation can be delayed without variance.
 