| Wildlife | Form: (04 ) 404234759 6/18/2025 | Mule Deer and Elk BMPs
1. Wildlife – Minimization: To minimize the potential for wildlife related traffic accidents, TEP has implemented speed restrictions for all lease roads and requires that all TEP employees and contractors adhere to these posted speed restrictions.
2. Wildlife – Minimization: TEP will make best efforts to minimize operations at these location during winter months by conducting operations, when possible, between 9:00am to 4:00pm when wildlife activity minimal.
3. Wildlife – Minimization: TEP will minimize vehicle numbers and traffic by carpooling to the site whenever possible. |
| Wildlife | Form: (04 ) 404234759 6/18/2025 | Bald Eagle Roost Site BMPs
1. Wildlife – Avoidance: TEP will complete planned workover activities prior to Bald Eagle Roost Site Timing Limitation (November 15 - March 15). TEP will consult with CPW regarding any workover activities that may be delayed and likely to occur during the Timing Limitation. |