| Permit | Form: (04) 401137229 02/23/2017 | Operator shall meet the requirements of the Conductor Notice to Operators dated 10-6-2016 by March 1, 2016: (a) Plug conductor and reclaim site, (b) request to keep conductor and provide additional financial assurance, or (c) submit an alternative plan as a variance request. |
| Engineer | Form: (04) 401217668 12/14/2017 | 1) Operator shall submit an Application for Permit to Drill, Form 2 for each preset conductor within 30 days of approval of this sundry. Operator shall maintain a valid permit for each preset conducor until the well has been drilled or the conductor has been plugged. |