LOCATION333163Sullivan
26H-P268
CRESTONE PEAK RESOURCES OPERATING LLC
10633
AC
2/1/2026
SPINDLE
77900
FREDERICK/WELD  123
SESE 26 2N68W 6
333163View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400675568
01/02/2015
Operator shall provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400675568
1/5/2015
Per Rule 604.c.(2)E.i. Where technologically feasible and economically practicable, operators shall consolidate wells to create multi-well pads, including shared locations with other operators. Multi-well production facilities shall be located as far as possible from Building Units.
Traffic controlForm: (02A )
400675568
1/5/2015
Under Rule 604.c.(2).D, if required by the local government, a traffic plan shall be coordinated with the local jurisdiction prior to commencement of move in and rig up. Any subsequent modification to the traffic plan must be coordinated with the local jurisdiction.
General HousekeepingForm: (02A )
400675568
1/5/2015
All surface trash, debris, scrap or discarded material connected with the operations of the property shall be removed from the premises or disposed of in a legal manner.
General HousekeepingForm: (02A )
400675568
1/5/2015
The well site will be cleared of all non-essential equipment, trash and debris after ninety days of a well P&A.
General HousekeepingForm: (02A )
400675568
1/5/2015
Encana will identify plugged and abandoned wellbores according to Rule 319.a.(5). including the location of the wellbore with a permanent monument as specified in Rule 319.a.(5). Encana will also inscribe or imbed the well number and date of plugging upon the permanent monument.
General HousekeepingForm: (02A )
400675568
1/5/2015
Per Rule 604.c.(2)N. Any material not in use that might constitute a fire hazard will be removed a minimum of twenty-five (25) feet from the wellhead, tanks and separator. Any electrical equipment installations inside the bermed area will comply with API RP 500 classifications and comply with the current national electrical code as adopted by the State of Colorado.
General HousekeepingForm: (02A )
400675568
1/5/2015
Per Rule 803, to the extent practicable, Encana shall direct site lighting downward and inward, and lighting shall be shielded so as to avoid glare on public roads and Building Units within one thousand (1000) feet.
Dust controlForm: (02A )
400675568
1/5/2015
Per Rule 805.c, Encana shall employ practices for control of fugitive dust caused by operations, such practices to include, but not limited to use of speed restrictions, regular road maintenance, restriction of construction activity during high wind days and silica dust controls when handling sand used in hydraulic fracturing operations. Additional management practices such as road surfacing, wind breaks and barriers, or automation of wells to reduce truck traffic may also be required if technologically feasible and economically reasonable to minimize fugitive dust emissions.
ConstructionForm: (02A )
400675568
1/5/2015
The pad will be constructed in such a manner that noise mitigation may be installed and removed without disturbing the site or landscaping.
ConstructionForm: (02A )
400675568
1/5/2015
Subject pad will have all weather access roads to allow for operator and emergency response.
ConstructionForm: (02A )
400675568
1/5/2015
Encana will install fencing to restrict access to wellheads and equipment. (If in a town, "Fencing style will be installed as required by the town".)
ConstructionForm: (02A )
400675568
1/5/2015
At the time of construction, all leasehold roads will be constructed to accommodate local emergency vehicle access requirements, and will be maintained in a reasonable condition.
ConstructionForm: (02A )
400675568
1/5/2015
Production facilities, observable from any public highway shall be painted with uniform, non-contrasting, non-reflective color tones and with colors matched to but slightly darker than the surrounding landscape.
Noise mitigationForm: (02A )
400675568
1/5/2015
Encana will perform a baseline noise survey prior to any operational activity measuring dBA at a distance 350 feet from the noise source (unless there is an occupied structure closer than that – then measurement will be taken 25 feet from the structure). If low frequency noise is a concern, measurement of dBC will be taken 25 feet from the occupied structure towards the noise source. As necessary, based on the survey, Encana will install temporary sound walls to minimize noise and light impacts during drilling and completions and will install permanent noise mitigation at the facility location as necessary to meet all COGCC regulations.
Noise mitigationForm: (02A )
400675568
1/5/2015
The subject location will be constructed to allow potential future noise mitigation installation without disturbance.
Odor mitigationForm: (02A )
400675568
1/5/2015
Per Rule 805.b.(3)B.iii. Well effluent containing more than ten (10) barrels per day of condensate or within two (2) hours after first encountering hydrocarbon gas of salable quality will be directed to a combination of sand traps, separators, surge vessels, and tanks as needed to ensure safe separation of sand, hydrocarbon liquids, water, and gas and to ensure salable products are efficiently recovered for sale or conserved and that non-salable products are disposed of in a safe and environmentally responsible manner.
Drilling/Completion OperationsForm: (02A )
400675568
1/5/2015
Guy line anchors in the DJ Basin are not installed. Encana will use an engineered base beam that we guy wire anchor the derricks to.
Drilling/Completion OperationsForm: (02A )
400675568
1/5/2015
Encana will utilize a closed-loop system for drilling operations at this location.
Drilling/Completion OperationsForm: (02A )
400675568
1/5/2015
Encana will not utilize pits.
Drilling/Completion OperationsForm: (02A )
400675568
1/5/2015
Upon initial rig-up and at least once every thirty (30) days during drilling operations thereafter, pressure testing of the casing string and each component of the blowout prevention equipment including flange connections will be performed to seventy percent (70%) of working pressure or seventy percent (70%) of the internal yield of casing, whichever is less. Pressure testing will be conducted and the documented results will be retained by the operator for inspection by the Director for a period of one (1) year. Activation of the pipe rams for function testing will be conducted on a daily basis when practicable.
Drilling/Completion OperationsForm: (02A )
400675568
1/5/2015
Adequate blowout prevention equipment will be used on all well servicing operations.
Drilling/Completion OperationsForm: (02A )
400675568
1/5/2015
Backup stabbing valves will be used on well servicing operations during reverse circulation. Valves will be pressure tested before each well servicing operation using both low-pressure air and high-pressure fluid.
Pre-ConstructionForm: (04 )
401356012
9/19/2017
The pad will be constructed in such a manner that noise mitigation may be installed and removed without disturbing the site or landscaping.
Pre-ConstructionForm: (04 )
401356012
9/19/2017
Crestone will comply with COGCC Rule 1002.f.(2). by utilizing BMPs at the oil and gas location to control stormwater runoff in a manner that minimizes erosion, transport of sediment offsite, site degradation and protects surface waters.
Pre-ConstructionForm: (04 )
401356012
9/19/2017
Crestone will install fencing to restrict access to wellheads and equipment. (If in a town, "Fencing style will be installed as required by the town".)