| Material Handling and Spill Prevention | Form: (02A ) 400167617 6/24/2011 | Kerr McGee will build a 2 foot tall earthen berm along the entire Northeast side of the location along with the silt fence to keep sediment out of the ditch that is roughly 121 feet away. |