| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | Anadarko has prepared two stormwater management plans to
ensure our compliance with COGCC and CDPHE stormwater
management requirements. The CDPHE stormwater management
plan covers construction activities while the COGCC plan covers
post construction activities. In order to be in compliance with the
stormwater regulations, it is necessary for sediment containment
systems to be utilized at our sites. Sediment containment systems
consist of best management practices (BMP's) such as silt fencing,
straw bales, erosion control blankets, continuous berms etc. A
combination of BMP's may be used at any given site. Anadarko
strives to use BMP's that are least intrusive, yet provide the
required sediment control and surface water protection. The
sediment controls used are determined at the time of construction.
Copies of both stormwater management plans are kept at our field
office in Evans and our region office in Denver along with a copy
at the Colorado Oil and Gas Conservation Commission and are
available for inspection. |