Environmental | Form: (04 ) 401753865 9/10/2018 | ANALYTICAL LABORATORY RESULTS OF REPRESENTATIVE WATER SAMPLES FROM LOCATION(S) OF WHERE FLUIDS ARE BEING TRANSFERRED FROM SHALL BE SUBMITTED TO THE COGCC WITHIN 45 DAYS OF APPROVAL OF THIS PLAN. ANALYTICAL LABORATORYANALYSIS SHALL INCLUDE:
•VOLATILE ORGANIC COMPOUNDS, EPA METHOD 624 (GC/MS)
•SEMI-VOLATILE ORGANIC COMPOUNDS, EPA METHOD 625 (GC/MS)
•DISSOLVED METALS, EPA METHOD 200.7 (ICP)
•DISSOLVED INORGANICS (NON-METALS), EPA METHOD 300.0 (IC)
oBr,Cl,F,Nitrate/Nitrite, Sulfate
•GENERAL WATER QUALITY PARAMETERS
oSPECIFIC CONDUCTANCE, EPA METHOD 300.0 (IC)
oHARDNESS,EPA METHOD 130.1
oTOTAL DISSOLVED SOLIDS,EPA METHOD 160.1
opH,EPA METHOD 150.2
oALKALINITYEPA METHOD 310.1
•GROSS ALPHA AND BETA RADIOACTIVITYEPA METHOD 900.1 |
Environmental | Form: (04 ) 401753865 9/10/2018 | IF LOCATIONS ARE IN A SENSITIVE AREA BECAUSE OF ITS PROXIMITY TO SURFACE WATER OPERATOR MUST ENSURE 110 PERCENT SECONDARY CONTAINMENT FOR ANY VOLUME OF FLUIDS CONTAINED AT THE WATER ANDLING FACILITY SITE DURING NATURAL GAS DEVELOPMENT ACTIVITIES AND OPERATIONS; INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION OF A BERM OR DIVERSION DIKE, DIVERSION/COLLECTION TRENCHES WITHIN AND/OR OUTSIDE OF BERMS/DIKES, SITE GRADING, OR OTHER COMPARABLE MEASURES (I.E., BEST MANAGEMENT PRACTICES (BMPS) ASSOCIATED WITH STORMWATER MANAGEMENT) SUFFICIENTLY PROTECTIVE OF NEARBY SURFACE WATER. ANY BERM CONSTRUCTED AT THE WELL PAD LOCATION WILL BE STABILIZED, INSPECTED AT REGULAR INTERVALS (AT LEAST EVERY 14 DAYS), AND MAINTAINED IN GOOD CONDITION. |
Environmental | Form: (04 ) 401753865 9/10/2018 | OPERATOR MUST IMPLEMENT BEST MANAGEMENT PRACTICES TO CONTAIN ANY UNINTENTIONAL RELEASE OF FLUIDS, INCLUDING ANY FLUIDS CONVEYED VIA TEMPORARY SURFACE PIPELINES. |
Environmental | Form: (04 ) 401753865 9/10/2018 | OPERATOR PROPOSES THAT THIS FACILITY WILL BE IN OPERATION UNTIL MARCH 31, 2019. THIS TRANSFER CAN BE EXTENDED VIA SUNDRY REQUEST. |
Environmental | Form: (04 ) 401753865 9/10/2018 | TERMINATION OF ACITIVITES: BOTH TEP AND LARAMIE SHALL NOTIFY THE COGCC VIA SUNDRY IMMEDIATELY UPON TERMINATION OF ACTIVITIES. |
Environmental | Form: (04 ) 401753865 9/10/2018 | TEP AND LARAMIE WILL EACH SEPERATELY SUBMIT AN ANNUAL REPORT TO THE COGCC SUMMARIXZING THE TRANSFER OF PRODUCTION WATER (BOTH AS TRANSFER AND RECEIVING OPERATOR) DURING THE CALENDAR YEAR AND INCUDING LABORATORY ANALYTICAL RESULTS FOR REPRESENTATIVE SAMPLES(S) OF THE PRODUCTION WATER PROVIDED AS THE
TRANSFER/RECIEVER. THE ANNUAL REPORT SHALL BE SUBMITTED ON OR BEFORE THE ANNIVERSAY OF THE FIRST DATE OF TRANSFER. |
Environmental | Form: (04 ) 401753865 9/10/2018 | PROVIDE PRECAUTIONS/SECONDARY CONTAINMENT THAT WILL BE INPLACE FOR BOTH BELOW GRADE AND ABOVE GRADE PIPELINES AS THEY CROSS STREAMS, SENSITVE AREAS, OR ALONG SENSITIVE AREAS. |
Environmental | Form: (04 ) 401753865 9/10/2018 | PRODUCED WATER OR FLOWBACK WATER OR OTHER EXPLORATION AND PRODUCTION WASTE SHALL NOT BE TEMPORARILY STORED IN MODULAR LARGE VOLUME STORAGE TANKS (MLVSTs). PRODUCED WATER OR FLOWBACK WATER SHALL BE TEMPORAILY STORED IN FRAC TANKS. |
Environmental | Form: (04 ) 401753865 9/10/2018 | Within 30-days of this Sundry approval provide the most current flowline integrity results of the TEP flowlines that will be used to convey fluids for this transfer. |