| Planning | Form: (02A ) 400284129 8/16/2012 | PLANNING BMP's
Share/consolidate corridors for pipeline ROWs to the maximum extent possible.
Maximize the utility of surface facilities by developing multiple wells from a single pad (directional drilling), and by co-
locating multipurpose facilities (for example, well pads and compressors) to avoid unnecessary habitat fragmentation
and disturbance of additional geographic areas.
Minimize newly planned activities and operations within 300 feet of the ordinary high water mark of any reservoir,
lake, wetland, or natural perennial or seasonally flowing stream or river.
Avoid constructing any road segment in the channel of an intermittent or perennial stream
Minimize the number, length, and footprint of oil and gas development roads
Use existing roads where possible
Combine utility infrastructure (gas, electric, and water) planning with roadway planning to avoid separate utility
corridors
Maximize the use of directional drilling to minimize habitat loss/fragmentation
Maximize use of remote telemetry for well monitoring to minimize traffic
|
| Interim Reclamation | Form: (02A ) 400284129 8/16/2012 | PRODUCTION/RECLAMATION BMP's
Use only certified weed-free native seed in seed mixes, except for non-native plants that benefit wildlife
WPX Energy will use certified, weed free grass hay, straw, hay or other mulch materials used for the reseeding and
reclamation of disturbed areas.
Install exclusionary devices to prevent bird and other wildlife access to equipment stacks, vents and openings.
Reduce visits to well-sites through remote monitoring (i.e. SCADA) and the use of multi-function contractors.
|
| Construction | Form: (02A ) 400284129 8/16/2012 | CONSTRUCTION BMP's
Design road crossings of streams to allow fish passage at all flows and to minimize the generation of sediment.
|