LOCATION319537Mumby State
36H-P266
CRESTONE PEAK RESOURCES OPERATING LLC
10633
AC
12/11/2025
WATTENBERG
90750
WELD  123
SESE 36 2N66W 6
319537View Related
 
COGIS - Conditions of Approval Results
No records to display.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400543999
4/6/2014
The proposed location will be consolidated with an existing location, ID #319537, that contains the Mumby State #1, API #05-123-11429. The existing tanks for the Mumby State #1 will be moved and placed in the proposed facilities area. The facilities area was designated per the surface owner's request.
Pre-ConstructionForm: (02A )
400543999
4/6/2014
Prior to construction, Encana will write a "Risk Assessment Needs Determination" document to analyze the site for any other potential mitigation measures that might be needed.
Traffic controlForm: (02A )
400543999
4/6/2014
After meetings with the surrounding Building Unit Owners, a request was made for the speed limit to be reduced on County Road 37 and "Children At Play" signs to be installed. Encana does not have jurisdiction over County Roads, however, we are working with Weld County to see if they will implement these requests. Nothing has been agreed upon at this time but Weld County is aware of these concerns.
General HousekeepingForm: (02A )
400543999
4/6/2014
Any material not in use that might constitute a fire hazard will be removed a minimum of twenty-five (25) feet from the wellhead, tanks and separator. Any electrical equipment installations inside the bermed area will comply with API RP 500 classifications and comply with the current national electrical code as adopted by the State of Colorado.
General HousekeepingForm: (02A )
400543999
4/6/2014
All surface trash, debris, scrap or discarded material connected with the operations of the property shall be removed from the premises or disposed of in a legal manner.
Material Handling and Spill PreventionForm: (02A )
400543999
4/6/2014
Well effluent containing more than ten (10) barrels per day of condensate or within two (2) hours after first encountering hydrocarbon gas of salable quality will be directed to a combination of sand traps, separators, surge vessels, and tanks as needed to ensure safe separation of sand, hydrocarbon liquids, water, and gas and to ensure salable products are efficiently recovered for sale or conserved and that non-salable products are disposed of in a safe and environmentally responsible manner.
Material Handling and Spill PreventionForm: (02A )
400543999
4/6/2014
Encana's Leak Detection Program: • annual hydrostatic test on the oil dump line from the separator to the tank battery. • annual hydrostatic “static” tests on our oil tanks. • Annual hydrostatic “static” tests on our produced water tank and water dump line from the separator to the produced water tank. • Lease Operator inspections of all equipment not to exceed 48 hours. • Monthly documented inspections (EU). • Annual environmental inspections of all battery and well equipment and pads. • Annual UT inspections of the pressure vessels and input into Encana’s RIPL Predictive Integrity Maintenance Program. (HLP separators and fuel gas separators)
Dust controlForm: (02A )
400543999
4/6/2014
Per meetings with the surrounding Building Unit Owners, Encana will work with Weld County to reduce dust caused by our increased truck traffic. Encana will use mag chloride, install crushed concrete on the access road and use street sweepers if necessary.
ConstructionForm: (02A )
400543999
4/6/2014
The pad will be constructed in such a manner that noise mitigation may be installed and removed without disturbing the site or landscaping.
ConstructionForm: (02A )
400543999
4/6/2014
Subject pad will have all weather access roads to allow for operator and emergency response.
ConstructionForm: (02A )
400543999
4/6/2014
Encana utilizes 48” tall corrugated galvanized metal berm walls with a capacity in excess of 150% of the largest tank contained within the wall.   In addition, Encana best practices mandates the use of impervious liners that extends under each storage tank and up the walls, permanently affixed to the top of the metal berm wall.    Protrusions of piping that come through the liner include a fully sealed “boot” to prevent leakage.
ConstructionForm: (02A )
400543999
4/6/2014
Encana will install fencing to restrict access to wellheads and equipment.
Noise mitigationForm: (02A )
400543999
4/6/2014
Per meetings with the surrounding Building Unit Owners, Encana will install 32' temporary sound walls on this location through drilling and completion operations.
Noise mitigationForm: (02A )
400543999
4/6/2014
Encana will perform a baseline noise survey prior to any operational activity measuring dBA at a distance 350 feet from the noise source. If low frequency noise is a concern, measurement of dBC will be taken 25 feet from the occupied structure towards the noise source.
Noise mitigationForm: (02A )
400543999
4/6/2014
The subject location will be constructed to allow potential future noise mitigation installation without disturbance.
Emissions mitigationForm: (02A )
400543999
4/6/2014
Flow lines, separators, and sand traps capable of supporting green completions as described in Rule 805 will be installed on subject location at which commercial quantities of gas are reasonably expected to be produced based on existing adjacent wells within 1 mile. Temporary flowback flaring an doxidizing equipment will include: adequeately sized equipment to handle 1.5 times the largest flowback volume of gas experienced in a ten mile radius. If there is overrun, Encana will shut in the well versus freely venting
Drilling/Completion OperationsForm: (02A )
400543999
4/6/2014
Closed-top tanks will utilize backpressure systems that exert a minimum of four (4) ounces of backpressure and a maximum that does not exceed the pressure rating of the tank to facilitate gathering and combustion of tank 800-5 C.
Drilling/Completion OperationsForm: (02A )
400543999
4/6/2014
Upon initial rig-up and at least once every thirty (30) days during drilling operations thereafter, pressure testing of the casing string and each component of the blowout prevention equipment including flange connections will be performed to seventy percent (70%) of working pressure or seventy percent (70%) of the internal yield of casing, whichever is less. Pressure testing shall be conducted and the documented results will be retained by the operator for inspection by the Director for a period of one (1) year. Activation of the pipe rams for function testing shall be conducted on a daily basis when practicable.
Drilling/Completion OperationsForm: (02A )
400543999
4/6/2014
Encana will employ a rig without kelly that has double ram with blind and pipe ram and an annular preventer. At least one person at the well site during drilling operations will have Mineral Management certification or Director approved training for blowout prevention.
Drilling/Completion OperationsForm: (02A )
400543999
4/6/2014
Backup stabbing valves shall be required on well servicing operations during reverse circulation. Valves shall be pressure tested before each well servicing operation using both low-pressure air and high-pressure fluid.
Drilling/Completion OperationsForm: (02A )
400543999
4/6/2014
Guy line anchors in the DJ Basin are not installed. Encana will use an engineered base beam that we guy wire anchor the derricks to.
Drilling/Completion OperationsForm: (02A )
400543999
4/6/2014
All newly installed or replaced crude oil and condensate storage tanks will be designed, constructed, and maintained in accordance with National Fire Protection Association (NFPA) Code 30 (2008 version). Encana will maintain written records verifying proper design, construction, and maintenance, and will make these records available for inspection by the Director. In addition, onsite inspections are conducted internally to insure guidelines are met.
Drilling/Completion OperationsForm: (02A )
400543999
4/6/2014
Prior to drilling operations, Operator will perform an anti-collision scan of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision scan will include definitive MWD or gyro surveys of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed wellpath with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottomhole location. The proposed well will only be drilled if the anti-collision scan results indicate that there is not a risk for collision, or harm to people or the environment.  For the proposed well, upon conclusion of drilling operations, an as-constructed gyro survey will be submitted to COGCC with the Form 5.
Drilling/Completion OperationsForm: (02A )
400543999
4/6/2014
Encana will utilize a closed-loop system for drilling operations at this location. Encana will not utilize pits.