LOCATION311852BOIES RANCH
B-19N PAD
TEP ROCKY MOUNTAIN LLC
96850
AC
9/1/2025
SULPHUR CREEK
80090
RIO BLANCO  103
SESW 19 2S97W 6
311852View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
401380785
01/02/2018
Operator shall pressure test pipelines (flowlines from wellheads to separators to tanks; and any temporary surface lines used for hydraulic stimulation and/or flowback operations) in accordance with Rule 1101.e.(1) prior to putting into initial service any temporary surface or permanent buried pipelines and following any reconfiguration of the pipeline network, and tested annually, unless agreed to by both parties that the flowlines can be managed under an approved COGCC variance.
OGLAForm: (02A)
401380785
01/02/2018
The moisture content of water/bentonite based mud (WBM) generated drill cuttings managed onsite shall be kept as low as practicable to prevent accumulation of liquids greater than de minimis amounts. The operator has indicated in the ‘DRILLING WASTE MANAGEMENT PROGRAM SECTION’ of the Form 2A; that ‘Cuttings Disposal’ will be “OFFSITE” and that the ‘Cuttings Disposal Method’ will be “Beneficial reuse”, ‘Other Disposal Description’ as “PLEASE SEE ATTACHED WASTE MANAGEMENT PLAN”. Any proposed offsite disposal or beneficial reuse of cuttings to another oil and gas location shall not occur until approval of a Form 4 Sundry Notice specifying disposal or beneficial reuse location and cuttings material sampling and characterization methods. A Form 4 Sundry Notice must also be submitted for any of the WBM drill cuttings that will remain on the well pad location and must be sampled and meet the applicable standards of Table 910-1. Flowback and stimulation fluids must be sent to enclosed tanks, separators, or other containment/filtering equipment before the fluids can be placed into any pipeline or storage vessel; or into tanker trucks for offsite disposal. No open top tanks can be used for initial flowback fluids containment. The flowback and stimulation fluid tanks, separators, or other containment/filtering equipment must be placed on the well pad in an area constructed to be sufficiently impervious to contain any spilled or released material. Potential odors associated with the completions process and/or with long term production operations must be controlled/mitigated.
OGLAForm: (02A)
401380785
01/02/2018
Operator must ensure secondary containment for any volume of fluids contained at the well site during drilling and completion operations; additional stormwater controls may be required for the existing well pad area of this oil and gas location. Strategically apply fugitive dust control measures to reduce fugitive dust and coating of vegetation and deposition in water sources.
OGLAForm: (02A)
401380785
01/02/2018
In addition to the notifications required by COGCC listed in the Northwest Notification Policy (Notice of Intent to Construct a New Location, Notice of Intent to Spud Surface Casing, and Notice of Intent to Commence Hydraulic Fracturing Operations) and Rule 316C. COGCC Form 42. FIELD OPERATIONS NOTICE (a. Notice of Intent to Conduct Hydraulic Fracturing Treatment and c. Notice of Construction or Major Change); operator shall notify the COGCC 48 hours prior to pipeline testing (flowlines from wellheads to separators to tanks; permanent buried take away pipelines; and/or any temporary surface lines used for hydraulic stimulation and/or flowback operations) using the Form 42 (as described in Rule 316C.m. Notice of Completion of Form 2/2A Permit Conditions). The appropriate COGCC individuals will automatically be email notified.
Reclamation SpecialistForm: (04)
401283650
06/19/2018
1) Approval of this form is an approval of the NTO request only. Areas detailed in the attached map are not a final delineation of the exact areas needed for production operations or interim reclamation, and are only an estimate. Future assessments regarding the size and extent of the areas needed for production may be determined on the ground by reclamation staff during a field inspection. 2) Financial assurance bond will not be released until the location meets reclamation Rules, including vegetation standards. 3) Financial assurance bonds must be received within 45 days from this email notification.
EnvironmentalForm: (04)
401740008
08/27/2018
ANALYTICAL LABORATORY RESULTS OF REPRESENTATIVE WATER SAMPLES FROM LOCATION(S) OF WHERE FLUIDS ARE BEING TRANSFERRED FROM SHALL BE SUBMITTED TO THE COGCC WITHIN 45 DAYS OF APPROVAL OF THIS PLAN. ANALYTICAL LABORATORYANALYSIS SHALL INCLUDE: •VOLATILE ORGANIC COMPOUNDS, EPA METHOD 624 (GC/MS) •SEMI-VOLATILE ORGANIC COMPOUNDS, EPA METHOD 625 (GC/MS) •DISSOLVED METALS, EPA METHOD 200.7 (ICP) •DISSOLVED INORGANICS (NON-METALS), EPA METHOD 300.0 (IC) oBr,Cl,F,Nitrate/Nitrite, Sulfate •GENERAL WATER QUALITY PARAMETERS oSPECIFIC CONDUCTANCE, EPA METHOD 300.0 (IC) oHARDNESS, EPA METHOD 130.1 oTOTAL DISSOLVED SOLIDS, EPA METHOD 160.1 opH, EPA METHOD 150.2 oALKALINITY, EPA METHOD 310.1 •GROSS ALPHA AND BETA RADIOACTIVIT, EPA METHOD 900.1
EnvironmentalForm: (04)
401740008
08/27/2018
Within 30-days of this Sundry approval provide the most current flowline integrity results of the Ursa flowlines that will be used to convey fluids for this transfer.
EnvironmentalForm: (04)
401740008
08/27/2018
PRODUCED WATER OR FLOWBACK WATER OR OTHER EXPLORATION AND PRODUCTION WASTE SHALL NOT BE TEMPORARILY STORED IN MODULAR LARGE VOLUME STORAGE TANKS (MLVSTs). PRODUCED WATER OR FLOWBACK WATER SHALL BE TEMPORAILY STORED IN FRAC TANKS.
EnvironmentalForm: (04)
401740008
08/27/2018
PROVIDE PRECAUTIONS/SECONDARY CONTAINMENT THAT WILL BE INPLACE FOR BOTH BELOW GRADE AND ABOVE GRADE PIPELINES AS THEY CROSS STREAMS, SENSITVE AREAS, OR ALONG SENSITIVE AREAS.
EnvironmentalForm: (04)
401740008
08/27/2018
URSA AND XTO WILL EACH SEPERATELY SUBMIT AN ANNUAL REPORT TO THE COGCC SUMMARIXZING THE TRANSFER OF PRODUCTION WATER (BOTH AS TRANSFER AND RECEIVING OPERATOR) DURING THE CALENDAR YEAR AND INCUDING LABORATORY ANALYTICAL RESULTS FOR REPRESENTATIVE SAMPLES(S) OF THE PRODUCTION WATER PROVIDED AS THE TRANSFER/RECIEVER. THE ANNUAL REPORT SHALL BE SUBMITTED ON OR BEFORE THE ANNIVERSAY OF THE FIRST DATE OF TRANSFER.
EnvironmentalForm: (04)
401740008
08/27/2018
TERMINATION OF ACITIVITES: BOTH URSA AND XTO SHALL NOTIFY THE COGCC VIA SUNDRY IMMEDIATELY UPON TERMINATION OF ACTIVITIES.
EnvironmentalForm: (04)
401740008
08/27/2018
OPERATOR PROPOSES THAT THIS FACILITY WILL BE IN OPERATION FOR A PERIOD OF 365 DAYS. THIS TRANSFER CAN BE EXTENDED VIA SUNDRY REQUEST, HOWEVER, SHOULD THE OPERATION OF THIS FACILITY CONTINUE MORE THAN ONE YEAR, A FORM 28 SHALL BE SUBMITTED AND APPROVED BEFORE THE ONE-YEAR ANNIVERSARY DATE OF THE FIRST USE OF THE TRANSFER FACIITY/LOCATION.
EnvironmentalForm: (04)
401740008
08/27/2018
OPERATOR MUST IMPLEMENT BEST MANAGEMENT PRACTICES TO CONTAIN ANY UNINTENTIONAL RELEASE OF FLUIDS, INCLUDING ANY FLUIDS CONVEYED VIA TEMPORARY SURFACE PIPELINES.
EnvironmentalForm: (04)
401740008
08/27/2018
IF LOCATIONS ARE IN A SENSITIVE AREA BECAUSE OF ITS PROXIMITY TO SURFACE WATER OPERATOR MUST ENSURE 110 PERCENT SECONDARY CONTAINMENT FOR ANY VOLUME OF FLUIDS CONTAINED AT THE WATER HANDLING FACILITY SITE DURING NATURAL GAS DEVELOPMENT ACTIVITIES AND OPERATIONS; INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION OF A BERM OR DIVERSION DIKE, DIVERSION/COLLECTION TRENCHES WITHIN AND/OR OUTSIDE OF BERMS/DIKES, SITE GRADING, OR OTHER COMPARABLE MEASURES (I.E., BEST MANAGEMENT PRACTICES (BMPS) ASSOCIATED WITH STORMWATER MANAGEMENT) SUFFICIENTLY PROTECTIVE OF NEARBY SURFACE WATER. ANY BERM CONSTRUCTED AT THE WELL PAD LOCATION WILL BE STABILIZED, INSPECTED AT REGULAR INTERVALS (AT LEAST EVERY 14 DAYS), AND MAINTAINED IN GOOD CONDITION.
Reclamation SpecialistForm: (04)
403430963
06/16/2023
Approval/Passing of the form 4 acknowledges that the Oil and Gas Conservation Commission has received the notice. Operator remains responsible for management of the Location, including Weed Management pursuant to Rules 1004.e and 606.c, and Stormwater Management pursuant to Rule 1002.f., until site receives a passing Final Reclamation inspection. A field inspection will be conducted at a future date to evaluate compliance with reclamation standards.
Reclamation SpecialistForm: (04)
403430963
06/16/2023
Pursuant to Rule 1003.e.(3), Operator shall submit an Interim reclamation completion notice, Form 4, once Location has met COGCC 1003 standards.
 