Planning | Form: (02A ) 400450063 9/19/2013 | Maximize equipment and wellhead setbacks from occupied buildings and residences to the extent feasible and practicable, as determined by Encana.
Prior to commencement of any new drilling or completion operations, provide notification to landowners within one-half (1/2) mile of the well-site.
Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the well-site for informational purposes only, which Encana may revise from time to time during operations:
a) A summary of planned operations, including identified access points and operational timeline, for posting to a local community information web-page
b) A site plan for site preparation, mobilization and demobilization
c) A plan for interim reclamation and vegetation of the site and final reclamation of the site
d) A plan for noise, light and dust mitigation, to the extent feasible
e) A traffic management plan
f) Updates of this information if any change during operations |
Construction | Form: (02A ) 400450063 9/19/2013 | Utilize steel-rim berms around tanks and separators instead of sand or soil berms |
Drilling/Completion Operations | Form: (02A ) 400450063 9/19/2013 | Utilize closed-loop systems for drilling and completion operations to minimize the need for earthen pits
Utilize a high-low pressure vessel (HLP) and vapor recovery unit (VRU) for new wells drilled. Encana may remove the VRU system at such time Encana determines that the VRU system is no longer necessary due to reduced emission recoveries and/or efficiencies, but no earlier than one (1) year after the new well is drilled |
Community Outreach and Notification | Form: (02A ) 400746954 6/4/2015 | Maximize equipment and wellhead setbacks from occupied buildings and residences to the extent feasible and practicable, as determined by Encana. Prior to commencement of any new drilling or completion operations, provide
notification to landowners within one-half (1/2) mile of the well-site. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the well-site for informational purposes only, which Encana may revise from time to time during operations:
a) A summary of planned operations, including identified access points and operational timeline, for posting to a local community information web-page
b) A site plan for site preparation, mobilization and demobilization
c) A plan for interim reclamation and vegetation of the site and final reclamation of the site
d) A plan for noise, light and dust mitigation, to the extent feasible
e) A traffic management plan
f) Updates of this information if any change during operations |
Pre-Construction | Form: (02A ) 400746954 6/4/2015 | 604.c.(2)E – 15 wells will be drilled from this pad and will utilized the existing location. |
Traffic control | Form: (02A ) 400746954 6/4/2015 | 604.c.(2)D - a traffic plan shall be coordinated with the local jurisdiction prior to commencement of move in and rig up. Any subsequent modification to the traffic plan will be coordinated with the local jurisdiction. |
General Housekeeping | Form: (02A ) 400746954 6/4/2015 | Any material not in use that might constitute a fire hazard will be removed a minimum of twenty-five (25) feet from the wellhead, tanks and separator. Any electrical equipment installations inside the bermed area will comply with API RP 500 classifications and comply with the current national electrical code as adopted by the State of Colorado. |
General Housekeeping | Form: (02A ) 400746954 6/4/2015 | All surface trash, debris, scrap or discarded material connected with the operations of the property shall be removed from the premises or disposed of in a legal manner. |
General Housekeeping | Form: (02A ) 400746954 6/4/2015 | The well site will be cleared of all non-essential equipment, trash and debris after ninety days of a well P&A. |
General Housekeeping | Form: (02A ) 400746954 6/4/2015 | Encana will identify plugged and abandoned wellbores according to Rule 319.a.(5). including the location of the wellbore with a permanent monument as specified in Rule 319.a.(5). Encana will also inscribe or imbed the well number and date of plugging upon the permanent monument. |
Material Handling and Spill Prevention | Form: (02A ) 400746954 6/4/2015 | All loadlines will be capped for every location in the DJ. |
Material Handling and Spill Prevention | Form: (02A ) 400746954 6/4/2015 | Well effluent containing more than ten (10) barrels per day of condensate or within two (2) hours after first encountering hydrocarbon gas of salable quality will be directed to a combination of sand traps, separators, surge vessels, and tanks as needed to ensure safe separation of sand, hydrocarbon liquids, water, and gas and to ensure salable products are efficiently recovered for sale or conserved and that non-salable products are disposed of in a safe and environmentally responsible manner. |
Material Handling and Spill Prevention | Form: (02A ) 400746954 6/4/2015 | • Annual hydrostatic test on the oil dump line from the separator to the tank battery.
• Annual hydrostatic “static” tests on our oil tanks.
• Annual hydrostatic “static” tests on our produced water tank and water dump line from the separator to the produced water tank.
• Lease Operator inspections of all equipment not to exceed 48 hours.
• Monthly documented inspections (EU).
• Annual environmental inspections of all battery and well equipment and pads.
• Annual UT inspections of the pressure vessels and input into Encana’s RIPL Predictive Integrity Maintenance Program. (HLP separators and fuel gas separators) |
Construction | Form: (02A ) 400746954 6/4/2015 | The pad will be constructed in such a manner that noise mitigation may be installed and removed without disturbing the site or landscaping. |
Construction | Form: (02A ) 400746954 6/4/2015 | Encana utilizes 24” tall corrugated galvanized metal berm walls with a capacity in excess of 150% of the largest tank contained within the wall. In addition, Encana best practices mandates the use of impervious liners that extends under each storage tank and up the walls, permanently affixed to the top of the metal berm wall. Protrusions of piping that come through the liner include a fully sealed “boot” to prevent leakage. |
Construction | Form: (02A ) 400746954 6/4/2015 | Encana will install fencing to restrict access to wellheads and equipment |
Construction | Form: (02A ) 400746954 6/4/2015 | At the time of construction, all leasehold roads will be constructed to accommodate local emergency vehicle access requirements, and will be maintained in a reasonable condition. |
Construction | Form: (02A ) 400746954 6/4/2015 | 803 - To the extent practicable, site lighting shall be directed downward and inward and shielded so as to avoid glare on public roads and Building Units within one thousand (1000) feet. |
Noise mitigation | Form: (02A ) 400746954 6/4/2015 | Encana will perform a baseline noise survey prior to any operational activity measuring dBA at a distance 350 feet from the noise source (unless there is an occupied structure closer than that – then measurement will be taken 25 feet from the structure). If low frequency noise is a concern, measurement of dBC will be taken 25 feet from the occupied structure towards the noise source. As necessary, based on the survey, Encana will install temporary sound walls to minimize noise and light impacts during drilling and completions and will install permanent noise mitigation at the facility location as necessary to meet all COGCC regulations. |
Emissions mitigation | Form: (02A ) 400746954 6/4/2015 | Flow lines, separators, and sand traps capable of supporting green completions as described in Rule 805 will be installed on subject location at which commercial quantities of gas are reasonably expected to be produced based on existing adjacent wells within 1 mile. |
Emissions mitigation | Form: (02A ) 400746954 6/4/2015 | Encana will follow and comply with all leak detection and repair and storage tank emission management plan conditions as
required by Colorado Air Quality Control Commission Regulation Number 7. This will include at least monthly Audible,
Visual and Olfactory (AVO) inspections of the components and tanks at our Production Facilities at most weekly or at least
monthly starting on January 1, 2015. In addition, Encana will perform infra-red camera inspections of these components and the storage tanks at most monthly or at least annually. |
Emissions mitigation | Form: (02A ) 400746954 6/4/2015 | Current Encana drilling operations into and through productive horizons are planned to keep a hydrostatic “over-balance” on the formation. Encana does not intentionally drill ahead with flares and in cases where we do have flares, they are intermittent and only kept for the amount of time it takes to raise our drilling fluid weight to be over-balanced again. In more extreme cases of Well Control Operations, it’s possible to encounter a prolonged flare. This is required in order to bring operations back to normal and ensure proper safety of the rig/rig crews involved during this operation. These flaring instances are rare, but do occur. Encana typically has a good understanding of the pore pressures and will plan accordingly in order to help mitigate potential light impacts to nearby residents. |
Drilling/Completion Operations | Form: (02A ) 400746954 6/4/2015 | Encana will utilize a closed-loop system for drilling operations at this location. |
Drilling/Completion Operations | Form: (02A ) 400746954 6/4/2015 | Encana will not utilize pits. |
Drilling/Completion Operations | Form: (02A ) 400746954 6/4/2015 | All newly installed or replaced crude oil and condensate storage tanks will be designed, constructed, and maintained in accordance with National Fire Protection Association (NFPA) Code 30 (2008 version). Encana will maintain written records verifying proper design, construction, and maintenance, and will make these records available for inspection by the Director. In addition, onsite inspections are conducted internally to insure guidelines are met. |