UIC | Form: (31 ) 2092149 5/19/2015 | NGL shall submit a Form 4 Sundry Notice notifying the COGCC of the date of initial injection within thirty (30) days of initial injection.
|
UIC | Form: (31 ) 2092149 5/19/2015 | A water analysis to include TDS, major cations, and major anions is required 1-year after initial injection and from then on at 5-year intervals. Water analyses should be submitted via Sundry Notice and in Electronic Data Deliverable (EDD) Format. |
UIC | Form: (31 ) 2092149 5/19/2015 | Operator is required to install a seismometer at a location to be determined by the operator and COGCC from which seismic activity in the vicinity of the NGL #C5 injection well can be monitored. The operator will be responsible for maintenance of the seismometer. Data gathered by the seismometer will be made available to one or more third parties (such as the USGS, CU-Boulder, CSM, or CSU) for analysis. |
UIC | Form: (31 ) 2092149 5/20/2015 | Initial daily injection rate restricted to 10,000 bbl/day. If operator wishes to increase daily rate above 10,000 bbl/day, they must request increase from COGCC via Sundry Notice. |