Drilling/Completion Operations | Form: (02 ) 401772728 12/20/2018 | Kerr-McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012. |
Drilling/Completion Operations | Form: (02 ) 401772728 12/20/2018 | Anti-Collision: Kerr-McGee will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within one hundred fifty (150) feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators within one hundred fifty (150) feet prior to drilling. |
Drilling/Completion Operations | Form: (02 ) 401772728 12/20/2018 | 317.p Logging Program: One of the first wells drilled on the pad will be logged with Open Hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state "No open-hole logs were run" and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run.
|
Planning | Form: (04 ) 403031784 5/9/2022 | Operations are daylight-only; no lighting impacts are anticipated from operations. |
Community Outreach and Notification | Form: (04 ) 403031784 5/9/2022 | Courtesy notifications will be sent to all parcel owners with building units within 1,500 feet of the location letting them know about our subsequent well operations and providing contact information for Kerr McGee’s response line and online resources. |
Community Outreach and Notification | Form: (04 ) 403031784 5/9/2022 | Signs will be placed in conspicuous locations and will include Oxy contact information; the Oxy Stakeholder Relations team will respond to all community member inquiries. The signs will be placed so as not to create a potential traffic hazard |
Wildlife | Form: (04 ) 403031784 5/9/2022 | This location was reviewed using a desktop method to review publicly available wildlife data (including CPW & COGCC data) as well as internal wildlife datasets and aerial imagery. No risks were identified. All field personal are trained to identify wildlife risks and raise concerns |
Dust control | Form: (04 ) 403031784 5/9/2022 | Water will be placed on dirt access roads to mitigate dust as needed. |
Noise mitigation | Form: (04 ) 403031784 5/9/2022 | Operations will be in compliance with Table 423-1 requirements. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units. |
Odor mitigation | Form: (04 ) 403031784 5/9/2022 | Closed, upright tanks are being utilized to mitigate odor. |
Planning | Form: (04 ) 403233088 12/7/2022 | 24hr BMP: Site lighting will be shielded and directed downward and inward toward operations to avoid glare on public roads and nearby Building Units. |
Community Outreach and Notification | Form: (04 ) 403233088 12/7/2022 | Signs will be placed in conspicuous locations and will include Oxy contact information; the Oxy Stakeholder Relations team will respond to all community member inquiries. The signs will be placed so as not to create a potential traffic hazard |
Community Outreach and Notification | Form: (04 ) 403233088 12/7/2022 | Courtesy notifications will be sent to all parcel owners with building units within 1,500 feet of the location letting them know about our subsequent well operations and providing contact information for Kerr McGee’s response line and online resources. |
Wildlife | Form: (04 ) 403233088 12/7/2022 | This location was reviewed using a desktop method to review publicly available wildlife data (including CPW & COGCC data) as well as internal wildlife datasets and aerial imagery. No risks were identified. All field personal are trained to identify wildlife risks and raise concerns noticed during operations with the Health, Safety, and Environment (HSE) department. |
Dust control | Form: (04 ) 403233088 12/7/2022 | Water will be placed on dirt access roads to mitigate dust as needed. |
Noise mitigation | Form: (04 ) 403233088 12/7/2022 | Daylight hours BMPs: Operations will be in compliance with Table 423-1 requirements. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units.
24 hr BMP:Noise associated with pipe handling, traffic, and other operational activity will be minimized between 7:00 pm and 7:00 am. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units. |