| Drilling/Completion Operations | Form: (02 ) 401455501 2/15/2018 | Kerr-McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012. |
| Drilling/Completion Operations | Form: (02 ) 401455501 2/15/2018 | Anti-Collision: Kerr-McGee will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within one hundred fifty (150) feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators within one hundred fifty (150) feet prior to drilling. |
| Drilling/Completion Operations | Form: (02 ) 401455501 2/15/2018 | 317.p Logging Program: One of the first wells drilled on the pad will be logged with Cased-hole Pulsed Neutron Log with Gamma Ray Log the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run in that well and have those logs attached. The Form 5 for each well shall clearly state “No open-hole logs were run” and shall reference the Rule 317.p Exception granted for the well. |
| Drilling/Completion Operations | Form: (02 ) 401743848 8/27/2018 | Kerr-McGee acknowledges and will comply with the COGCC Policy for Bradenhead
Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area
dated May 29, 2012. |
| Drilling/Completion Operations | Form: (02 ) 401743848 8/27/2018 | Anti-Collision: Kerr-McGee will perform an anti-collision evaluation of all active
(producing, shut in, or temporarily abandoned) offset wellbores that have the potential
of being within one hundred fifty (150) feet of a proposed well prior to drilling
operations for the proposed well. Notice shall be given to all offset operators within
one hundred fifty (150) feet prior to drilling. |
| Drilling/Completion Operations | Form: (02 ) 401743848 8/27/2018 | 317.p Logging Program: One of the first wells drilled on the pad will be logged with
Cased-hole Pulsed Neutron Log with Gamma Ray Log the kick-off point into the
surface casing. All wells on the pad will have a cement bond log with gamma-ray run
on production casing (or on intermediate casing if production liner is run) into the
surface casing. The horizontal portion of every well will be logged with a measuredwhile-
drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad
will list all logs run in that well and have those logs attached. The Form 5 for each well
shall clearly state “No open-hole logs were run” and shall reference the Rule 317.p
Exception granted for the well. |