| Drilling/Completion Operations | Form: (02 ) 401455500 2/15/2018 | Kerr-McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012. |
| Drilling/Completion Operations | Form: (02 ) 401455500 2/15/2018 | Anti-Collision: Kerr-McGee will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within one hundred fifty (150) feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators within one hundred fifty (150) feet prior to drilling. |
| Drilling/Completion Operations | Form: (02 ) 401455500 2/15/2018 | 317.p Logging Program: One of the first wells drilled on the pad will be logged with Cased-hole Pulsed Neutron Log with Gamma Ray Log the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run in that well and have those logs attached. The Form 5 for each well shall clearly state “No open-hole logs were run” and shall reference the Rule 317.p Exception granted for the well. |
| Planning | Form: (04 ) 403096385 8/1/2022 | Operations are daylight-only; no lighting impacts are anticipated from operations.
IF 24HR RIG: Site lighting will be shielded and directed downward and inward toward operations to avoid glare on public roads and nearby Building Units. |
| Community Outreach and Notification | Form: (04 ) 403096385 8/1/2022 | Signs will be placed in conspicuous locations and will include Oxy contact information; the Oxy Stakeholder Relations team will respond to all community member inquiries. The signs will be placed so as not to create a potential traffic hazard |
| Community Outreach and Notification | Form: (04 ) 403096385 8/1/2022 | Courtesy notifications will be sent to all parcel owners with building units within 1,500 feet of the location letting them know about our subsequent well operations and providing contact information for Kerr McGee’s response line and online resources. |
| Wildlife | Form: (04 ) 403096385 8/1/2022 | This location was identified to be within a historical raptor nest buffer. If this operation is planned between 2/15 – 7/31, a field survey to determine the status of the nest will be required approximately 2 weeks prior to the start of operations. If the nest is determined to be active and work cannot be delayed, HSE will consult with CPW prior to operations beginning. |
| Dust control | Form: (04 ) 403096385 8/1/2022 | Water will be placed on dirt access roads to mitigate dust as needed. |
| Noise mitigation | Form: (04 ) 403096385 8/1/2022 | Operations will be in compliance with Table 423-1 requirements. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units.
IF 24HR RIG: Noise associated with pipe handling, traffic, and other operational activity will be minimized between 7:00 pm and 7:00 am. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units. |
| Odor mitigation | Form: (04 ) 403096385 8/1/2022 | Closed, upright tanks are being utilized to mitigate odor. |
| Planning | Form: (04 ) 403392466 6/12/2023 | Site lighting will be shielded and directed downward and inward toward operations to avoid glare on public roads and nearby Building Units. |
| Community Outreach and Notification | Form: (04 ) 403392466 6/12/2023 | Signs will be placed in conspicuous locations and will include Oxy contact information; the Oxy Stakeholder Relations team will respond to all community member inquiries. The signs will be placed so as not to create a potential traffic hazard |
| Community Outreach and Notification | Form: (04 ) 403392466 6/12/2023 | Courtesy notifications will be sent to all parcel owners with building units within 2,000 feet of the location letting them know about our subsequent well operations and providing contact information for Kerr McGee’s response line and online resources. |
| Wildlife | Form: (04 ) 403392466 6/12/2023 | Between 12/1 through 4/30, KMOG will only perform rig operations during daylight hours, Monday through Friday. KMOG access roads have speed limit restrictions that all personnel will follow. KMOG will shut down operations if an extreme winter storm is anticipated. |
| Dust control | Form: (04 ) 403392466 6/12/2023 | Water will be placed on dirt access roads to mitigate dust as needed. |
| Noise mitigation | Form: (04 ) 403392466 6/12/2023 | Noise associated with pipe handling, traffic, and other operational activity will be minimized between 7:00 pm and 7:00 am. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units. |