COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
401423275
11/9/2017
Operator acknowledges the proximity of the listed offset well(s). Operator agrees to comply with the DJ Basin Horizontal Offset Policy to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, submit Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the mitigated well(s), stating that appropriate mitigation was completed prior to the hydraulic stimulation of this well. Offset wells to mitigate: 05-123-05518, DOTY-FEDERAL 1, Option 3 05-123-05519, FEDERAL 1, Option 3 05-123-06118, HILZER 1, Option 3 05-123-11180, NILSEN FEDERAL 1, Option 3 05-123-11447, CROW 9-28, Option 3 05-123-12824, FEDERAL NORTH WILDHORSE 7-28, Option 1 05-123-19938, FEDERAL MACAW 33-1, Option 1 05-123-20233, FEDERAL FALCON 33-6, Option 1 05-123-20859, SHOWERS 4-4, Option 3 05-123-22634, FEDERAL GOSHAWK 28-13, Option 1
EngineerForm: (02 )
401423275
11/9/2017
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Oil-based drilling fluid is to be used only after setting surface casing.
EngineerForm: (02 )
401423275
11/9/2017
Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.: 1) All: Within 60 days of rig release, prior to stimulation. 2) Delayed completion: 6 months after rig release, prior to stimulation. 3) All: Within 30 days of first production, as reported on Form 5A.
EngineerForm: (02 )
402235600
1/2/2020
Operator acknowledges the proximity of the listed offset well(s). Operator agrees to comply with the DJ Basin Horizontal Offset Policy to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, submit Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the mitigated well(s), stating that appropriate mitigation was completed prior to the hydraulic stimulation of this well. Offset wells to mitigate: 05-123-05518, DOTY-FEDERAL 1, Option 3 05-123-05519, FEDERAL 1, Option 3 05-123-06118, HILZER 1, Option 3 05-123-11180, NILSEN FEDERAL 1, Option 3 05-123-11447, CROW 9-28, Option 3 05-123-12824, FEDERAL NORTH WILDHORSE 7-28, Option 1 05-123-19938, FEDERAL MACAW 33-1, Option 1 05-123-20233, FEDERAL FALCON 33-6, Option 1 05-123-20859, SHOWERS 4-4, Option 3 05-123-22634, FEDERAL GOSHAWK 28-13, Option 1
EngineerForm: (02 )
402235600
1/2/2020
1) Submit Form 42 online to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered. Bradenhead Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.: 1) All: Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation. 2) Delayed completion: 6 months after rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation. 3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.
PermitForm: (02 )
402235600
1/29/2020
If the location has not been built by the Form 2A (Doc #401423294) expiration date of 12/26/2020, Operator must Refile the Form 2A for approval prior to location construction.
EngineerForm: (02 )
402364832
5/18/2020
Offset Well Mitigation Operator acknowledges the proximity of the non-operated listed well. Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. FEDERAL GOSHAWK 28-13 (API 05-123-22634) FEDERAL MACAW 33-1 (API 05-123-19938) FEDERAL FALCON 33-6 (API 05-123-20233) Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the DJ Basin Horizontal Offset Policy (option 3). Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. SHOWERS 4-4 (API 05-123-20859) NILSEN FEDERAL 1 (API 05-123-11180) DOTY-FEDERAL 1 (API 05-123-07078) DOTY-FEDERAL 1 (API 05-123-05518) FEDERAL 1 (API 05-123-05519) HILZER 1 (API 05-123-06118) CROW 9-28 (API 05-123-11447) Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the DJ Basin Horizontal Offset Policy (option 4). Operator will submit a Form 42 (“OTHER- AS SPECIFIED BY PERMIT CONDITION”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. Bradenhead to remain open and monitored during all fracs. Be prepared to react to any increase in pressure or flow by shutting down frac and mitigating offset well bradenhead pressure prior to resuming frac. Notify COGCC via Form 42 - Notice of High Bradenhead Pressure During Stimulation. FEDERAL PLOVER 28-5 X (API 05-123-20126) FEDERAL TOUCAN 28-14 (API 05-123-20234) FEDERAL OSTRICH 29-8-6 (API 05-123-19666) FEDERAL PELICAN 33-8 (API 05-123-20243)
EngineerForm: (02 )
402364832
5/18/2020
Bradenhead Testing Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test: 1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation. 2) If a delayed completion, 6 months after rig release and prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation. 3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.
EngineerForm: (02 )
402364832
5/18/2020
General 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Oil-based drilling fluid is to be used only after all fresh water aquifers are covered. 4) The Operator will abide by the COGCC Policy for Bradenhead Monitoring During Hydraulic Fracturing Treatments in the Greater Wattenberg Area, May 29, 2012,
EngineerForm: (04 )
402918938
3/10/2022
Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the DJ Basin Horizontal Offset Policy (option 4). Operator will submit a Form 42 (“OTHER- AS SPECIFIED BY PERMIT CONDITION”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of all wells on this location. Bradenhead to remain open and monitoring during all fracs. Be prepared to react to any increase in pressure or flow by shutting down the frac and mitigating offset well bradenhead pressure prior to resuming frac. Notify COGCC via Form 42 - Notice of High Bradenhead Pressure During Stimulation. Federal Falcon (123-20233) Federal Macaw (123-19938) Federal Goshawk (123-22634)
EngineerForm: (04 )
402918938
3/31/2022
Approval of this sundry makes changes to the approved APD and must be displayed along with the APD while this well is being drilled and completed.
EngineerForm: (04 )
403719293
3/18/2024
This sundry was due 11/30/23 for discovery on 9/30/23. Perform the action plan as proposed by the operator herein for the next 6 months, 9/14/24. If after any 7 day shut-in period the pressure builds to the action threshold perform a bradenhead test and submit a Form 17 in 10 days, collect a sample of the bradenhead and production gas, if not previously done, and have them analyzed per ECMC guidelines and submit those results on a Form 43. At the end of the 6 months, perform a bradenhead test and submit a Form 17 in 10 days. Submit a sundry as well with the results of all the mitigation efforts to date.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02 )
401423275
12/27/2017
Plugged And Abandoned wells will be identified pursuant to 319.a.(5)
PlanningForm: (02 )
401423275
12/27/2017
Anti-collision: Operator will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within 150 feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators prior to drilling.
Drilling/Completion OperationsForm: (02 )
401423275
12/27/2017
A closed-loop system will be used for drilling operations. Blowout Prevention Equipment ("BOPE"): A double ram annular preventer will be used during drilling.
Drilling/Completion OperationsForm: (02 )
401423275
12/27/2017
317.p One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a meausred-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all the logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state "No open-hole logs were run" and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run).
Drilling/Completion OperationsForm: (02 )
402235600
1/30/2020
Blowout Prevention Equipment ("BOPE"): A double ram annular preventer will be used during drilling.
Drilling/Completion OperationsForm: (02 )
402235600
1/30/2020
Anti-collision: Operator will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within 150 feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators prior to drilling.
Drilling/Completion OperationsForm: (02 )
402235600
1/30/2020
Alternative Logging Program: One of the first wells drilled on the pad will be logged with an open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a Cement Bond Log with Gamma-Ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “Alternative Logging Program - No open-hole logs were run” and shall clearly identify the type of log and the well (by API#) in which open-hole logs were run.
Drilling/Completion OperationsForm: (02 )
402364832
6/30/2020
Blowout Prevention Equipment ("BOPE"): A double ram annular preventer will be used during drilling.
Drilling/Completion OperationsForm: (02 )
402364832
6/30/2020
Anti-collision: Operator will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within 150 feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators prior to drilling.
Drilling/Completion OperationsForm: (02 )
402364832
6/30/2020
Alternative Logging Program: One of the first wells drilled on the pad will be logged with an open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a Cement Bond Log with Gamma-Ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “Alternative Logging Program - No open-hole logs were run” and shall clearly identify the type of log and the well (by API#) in which open-hole logs were run.