Engineer | Form: (02 ) 401162590 2/7/2017 | Operator acknowledges the proximity of the listed non-operated well. Operator assures that this offset list will be remediated per the DJ Basin Horizontal Offset Policy (option 3). Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
05-123-07592, CLARA A BACON 1 |
Engineer | Form: (02 ) 401162590 2/7/2017 | Bradenhead tests shall be performed according to the following schedule and the Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release and prior to stimulation and
2) If a delayed completion, 6 months after rig release and prior to stimulation.
3) Within 30 days after first production, as reported on Form 5A. |
Engineer | Form: (02 ) 401162590 2/7/2017 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. |
Engineer | Form: (04 ) 401320075 6/29/2017 | This Form 4 makes changes to the approved Form 2 and must be displayed with the Form 2 while drilling.
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j. and provide cement coverage from end of 7-inch casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. |
Engineer | Form: (04 ) 401425063 10/17/2017 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j. and provide cement coverage from end of 7-inch casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
|
Engineer | Form: (04 ) 401670312 6/19/2018 | Operator must submit a Sundry no later than July 18, 2018, that summarizes the investigation and identifies the cause of the bradenhead pressure spike.
|
Engineer | Form: (04 ) 401705673 12/18/2020 | Operator has stated there was a consistent pressure response observed while pumping stages on this well. Since completion operations there have been no indications of communication between the production casing and the bradenhead annulus. This well has been monitored and there are no ongoing pressure issues.
|
Engineer | Form: (04 ) 403925386 9/24/2024 | 1) Provide electronic Form 42-Other ("Treatment") two business days ahead of operations.
2) During treatment operations, the operator will continuously monitor the surface and casing pressures of the wellbore being treated. If there is any reason to suspect a potential downhole failure during treatment operations, stop treatment and contact ECMC engineering.
3) The Operator will submit the Form 5A, Completed Interval Report within 30 days after the treatment operations
4) If treatment includes the use of a rig, Per RUle 408.m, conducta successful pressure test prior to stimulation. |
Engineer | Form: (04 ) 403957393 10/29/2024 | This well may be returned to annual testing and monthly monitoring. If at any point in the future bradenhead conditions meet thresholds defined by Order 1-232 a new bradenhead mitigation sundry must be filed. |