Planning | Form: (02 ) 400993941 7/5/2016 | In order to reduce surface disturbance and require multiple well pads, Ward is permitting a mutli well pad. |
Traffic control | Form: (02 ) 400993941 7/5/2016 | Traffic Plan: A traffic plan will be done if request by Weld County. Ward will construct all leasehold road to accommodate local emergency vehicle access requirements and will be maintained in a reasonable condition.
|
General Housekeeping | Form: (02 ) 400993941 7/5/2016 | Guy Line Anchors: All guy line anchors left buried for future use will be identified by a marker of bright color not less than four feet in height and not greater than one foot east of the guy line anchor.
|
General Housekeeping | Form: (02 ) 400993941 7/5/2016 | Removal of Surface Trash: Ward agrees that all trash, refuse pipe, equipment, liquids, chemicals of other materials that are not necessary for the continued operations of the wells will be removed and disposed of no later than 30 days after completion. No such items will be burned or buried on location. |
Material Handling and Spill Prevention | Form: (02 ) 400993941 7/5/2016 | Leak Detection Plan: To ensure protection for the surface during fracturing treatment, the location will be specifically constructed to contain any releases or spills. Secondary containment from any chemical spills or leaks will surround any trucks that carry, mix, or add chemicals to the flow stream as well as connections that could possibly leak fluid. If any spill or release occur, every reasonable step will be taken to quickly remediate the disturbed area.
|
Material Handling and Spill Prevention | Form: (02 ) 400993941 7/5/2016 | Ward and its contractor’s employ best management practices during the drilling and production of its wells and facilities. They will comply with appropriate COGCC and county rules concerning fire and safety. Ward will ensure that any flammable material will remain no less than 25 feet from the wellhead (s), tanks and separator(s).
|
Material Handling and Spill Prevention | Form: (02 ) 400993941 7/5/2016 | A containment berm or structure will be erected around the oil and water storage tanks. The berm will be inspected regularly and maintained in good condition. |
Material Handling and Spill Prevention | Form: (02 ) 400993941 7/5/2016 | Tanks shall be constructed and maintained in accordance with the National Fire Protection Association Code 30 (2008 version). All tanks will be visually inspected once a day. Recorded inspections will be conducted once a month pursuant to 40 CFR §112. |
Dust control | Form: (02 ) 400993941 7/5/2016 | Operator will comply with Rule 805.c and take all practicable measures to control fugitive dust caused by the operation, including but not limited to wetting the soil with fresh water via a truck with a spreader bar if deemed necessary. |
Construction | Form: (02 ) 400993941 7/5/2016 | Fencing: The wellsite will be fenced if requested by the Surface Owner. |
Noise mitigation | Form: (02 ) 400993941 7/5/2016 | A background noise study will be done prior to drilling and the appropriate mitigation measures (if necessary) will be chosen to meet or exceed COGCC noise requirements. |
Odor mitigation | Form: (02 ) 400993941 7/5/2016 | Ward will comply with Rule 805 and Department of Public Health and Environment, Air Quality Control Commission, Regulation No. 2 Odor Emission, 5 C.C.R. 1001-4, Regulation No. 3 (5 C.C.R. 1001-5), and Regulation No. 7 Section XVII.B.1 (a-c) and Section XII. |
Drilling/Completion Operations | Form: (02 ) 400993941 7/5/2016 | Closed Loop System will be used for drilling and fluid management. No reserve pit will be used. |
Drilling/Completion Operations | Form: (02 ) 400993941 7/5/2016 | BOPE tests will be run upon initial rig-up and at least once every thirty (30) days during drilling operations. Pressure testing of the casing string and each component of the blowout prevention equipment, including flange connections, will be performed to seventy percent (70%) of working pressure or seventy percent (70%) of the internal yield of casing, whichever is less. |
Drilling/Completion Operations | Form: (02 ) 400993941 7/5/2016 | One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run. |
Drilling/Completion Operations | Form: (02 ) 400993941 7/5/2016 | Light Pollution: Lighting abatement measure will be implemented, including the installation lighting shield devises on all of the more conspicuous lights, low density sodium lighting where practicable; and rig shrouding is no believed necessary as this is an industrial area and the only building unit within 1,000’ is owned by “Operator”.
|
Final Reclamation | Form: (02 ) 400993941 7/5/2016 | Identification of Plugged and Abandoned Wells: Pursuant to Rule 319.a.(5)., once the well has been plugged and abandoned, Ward will identify the location of the wellbore with a permanent monument that will detail the well name and date of plugging. |
Final Reclamation | Form: (02 ) 400993941 7/5/2016 | Well site cleared. Within 90 days subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site. |