Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-40290CB Rudd
6-61-18-0263BH2
HIGHPOINT OPERATING CORPORATION
10071
PR
5/1/2025
WATTENBERG
90750
WELD  123
Lot 4 7 6N61W 6
438823View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400658199
08/20/2014
For Lateral: 1) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 2) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (02)
400658199
08/20/2014
Operator acknowledges the proximity of the listed non-producing well(s). Operator agrees to provide mitigation Option 3 (per the DJ Basin Horizontal Offset Policy), ensure all applicable documentation is submitted, and submit Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. Bolin #1 (API #123-05228)
EngineerForm: (02)
400658196
08/21/2014
For Pilot Hole: 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
EngineerForm: (02)
400658199
09/24/2014
Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the DJ Basin Horizontal Offset Policy (option 3). Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. Bolin #1 (API# 123-05228)
EngineerForm: (02)
400658199
09/24/2014
FOR LATERAL 1) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 2) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
Final ReviewForm: (02)
400658199
09/24/2014
rereated comments/COAs - repopulated cultural distances - ccorrecting API for lateral
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400658196
9/22/2014
BBC will adhere to the COGCC Policy for Bradenhead Monitoring effective 5/29/12.
Drilling/Completion OperationsForm: (02 )
400658199
9/24/2014
BBC will adhere to COGCC Policy for Bradenhead Monitoring effective 5/29/12.